Council archive · source document
Attachment 7 - Flood Impact Assessment - Covey · 132005.638.06
Very large file (68.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Table 3-2 - Existing Hydraulic Structures
Type Upstream
Downstream Size
Invert No. of
ID C=circular Invert Level
Level (mm) Pipes
R=box culvert (m AHD)
(m AHD)
A01 C 15.464 15.262 600 1
B1 C 15.538 15.291 600 2
C1 C 15.526 15.394 600 1
E1 C 14.185 12.849 450 1
G1 C 13.393 13.363 500 1
G2 C 13.716 13.652 450 1
T1 C 20.05 19.86 600 1
T2 C 21.384 21.234 525 1
T3 C 18.722 18.572 900 2
T4 R 18.41 18.262 900 x 300 1
T5 C 18.033 17.883 375 1
T6 C 17.164 17.014 375 1
T7 C 15.15 14.993 375 1
T11 C 23.05 22.247 450 2
T12 C 23.156 23.589 500 1
T13 C 23.84 23.59 375 1
H1 R 16.798 16.735 1200 x 400 1
R1 C 13.419 13.382 500 1
R4 C 13.217 13.089 450 1
R41 C 13.645 13.513 450 1
R6 R 13.772 13.633 450 1
R9 C 14.381 14.28 430 1
R10 C 16.362 16.264 600 1
R11 C 15.732 15.102 600 1
R12 C 15.179 15.11 600 1
R13 C 19.34 19.331 650 1
R14 C 18.457 18.34 725 1
R15 C 17.769 17.679 750 1
R16 C 22.959 22.486 135 2
R23 C 13.391 12.878 375 1
Z1 C 12.932 12.568 450 4
Z2 C 12.07 12.005 375 2
Z3 C 12.932 12.568 525 2
Z4 C 14.01 14.001 500 2
P1 C 13.583 12.823 300 1
P3 C 13.922 13.594 300 1
P2 C 14.219 13.926 225 1
P4 C 13.998 13.62 150 1
P5 C 13.6 13.309 300 1
P6 C 13.298 12.897 300 1
Flood Impact Assessment Page 13 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
[OCR of page images]
Table 3-2 - Existing Hydraulic Structures
600
600
600
450
500
450
600
525
900
900 x 300
375
375
375
450
500
375
1200 x 400
500
450
450
450
430
600
600
600
650
725
750
135
375
450
375
525!
500
300
300
225
150
300
300
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
R
Cc
Cc
Cc
Cc
Cc
Cc
R
Cc
Cc
Cc
R
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Cc
Pl BP} PTE] PI RPI NI RIN BT REIN RJ RB] Ry Pye] By Py eye] Py Bye] Ry RIM Ry RT By RIN | By Ry RB] RB] Ry RIN] eB
Flood Impact Assessment Page 13 of 25
Project No 244035 | Ref No M25-0479Rpt — Issue A — January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.