Attachment 7 - Flood Impact Assessment - Covey · 132005.638.06
Very large file (68.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Table 3-3 - Developed Hydraulic Structures
Type Upstream Downstream
C=circular Invert Level Invert Level Size No. of
ID
R=box culvert (m AHD) (m AHD) (mm) Pipes
DEV01 R 12.310 12.200 2100 x 1500 6
3.14 Developed Case Scenario
The changes to the developed case scenario included:
• A design TIN to represent finished elevation levels for the proposed development site at each
stage of the development. Refer to Figure 2-3 for the developed case topography adopted
for each development stage in the model;
• Added a set of culverts for the road crossing at the existing clean water drain;
• Update the impervious area to represent the proposed development site; and
• Updated Manning’s n roughness coefficients and soil infiltration rates based on values shown
in the developed model Manning’s maps in Appendix B.
Flood Impact Assessment Page 14 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.