3.15 Results
Results from all modelled scenarios were exported and peak water surface levels have been mapped to
demonstrate conveyance within the overland flow paths. A comparison between the existing and
developed peak water surface levels, velocities and hazards was undertaken for all scenarios. The change
in water surface level was mapped to ensure no unacceptable offsite impacts were experienced and
ensure risk and flood hazard will be appropriately managed. Refer to the Flood Maps in Appendix C for
further detail.
Generally, it was demonstrated that the existing and developed overland flow paths have an adequate
conveyance of overland flow from upstream external catchments for all simulated events.
3.15.1 Onsite Impacts
In the developed scenario, during the 1% AEP climate change event, the water surface level on the
western internal roadways and drains increased between by up to 300 mm. However, this flow is safely
conveyed through the site without inundating the proposed buildings. In addition, the hazard (depth x
velocity) on the internal roads is acceptable (< 0.6 m2/s). This increase is also noted immediately upstream
of the proposed culverts (DEV01). This is expected as the proposed road crossing the channel will cause
head loss at this location as the flow enters the culverts. However, the results also demonstrated that the
road crossing has an immunity up to the 1% AEP climate change event. Similarly, within the drains on the
eastern side of the site, flows which are contained within the existing drains demonstrated increases of
up to 250 mm.
The northern section of the site, downstream of the area of works, contains vegetation and existing
overland flow paths. Increased in water surface level of 20-50 mm were noted in these areas. However,
these areas are part of the subject site and are unlikely to be developed, therefore the impacts are not
deemed an actionable nuisance.
The water surface levels in the vicinity of the HES basin and proposed buildings have been provided as
shown in Figure 3-5 and Table 3-4. The levels can be used to set the minimum floor levels as required.
Flood Impact Assessment Page 15 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.