Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Attachment 7 - Flood Impact Assessment - Covey · 132005.638.06

of 83

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (68.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

         2.2     Existing Land-use, Topography and Drainage

         The site in its existing state is the Noosa Resource Recovery Centre, which is mainly covered with
         maintained bushland in the northern portion of the site and existing buildings and landfill areas in the
         southern portion. The site is surrounded by bushland to the east, west and south. There are residential
         lots and a golf course to the north.

         The site slope is approximately 1.5%, with gradual changes in elevation from 30 m AHD to 16 m AHD. The
         site slopes from south to north and discharges over the northern boundary to the northern road reserve
         before flowing through the golf course. Note that the site also has an external upstream catchment to
         the south, which has been considered in the assessment.

         2.3     Proposed Land-use

         The Masterplan development is inclusive of a Recycle and Transfer Station Centre and associated
         infrastructure, which is replacing the Solid Waste Depot and Reviva Noosa Reuse Shop buildings. Further,
         a proposed HES basin and future stockpile and concrete crushing areas to replace the existing waste areas,
         a future compost facility area, a proposed solar farm, multiple landfill cells and associated infrastructure
         (access road, parking areas, etc.). Refer to Figure 2-2 for the development layout.




                                        Figure 2-2 – Proposed Development Masterplan



Flood Impact Assessment                                                                                       Page 5 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026

Used in these records

About this file

File size
68.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 7 - Flood Impact Assessment - Covey.pdf · 68.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.