Council archive · source document
Attachment 7 - Flood Impact Assessment - Covey · 132005.638.06
Very large file (68.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
The proposed development will be implemented in six stages. The components for each stage as shown
in Figure 2-2 are described in Table 2-1. The stage boundaries are shown in Figure 2-3.
Table 2-1 - Development Staging
Stage Description
RRA Expansion Project
1 Northern and Eastern Capping (including solar panels) & Compost facility
2 Resource and Recovery Precinct Project
3 Expansion cell 1.1 and 1.2
4 Future landfill cell 3.1
5 Future landfill cell 3.2
6 Future landfill cell 3.3 (ultimate case)
Figure 2-3 – Development Site Topography with Surrounding 0.5m Existing Contours
Flood Impact Assessment Page 6 of 25
Project No 244035 | Ref No M25-0479Rpt – Issue A – January 2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 7 - Flood Impact Assessment - Covey.pdfRelated documentApplication case desk ↗
About this file
- File size
- 68.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.