ATTACHMENT 1
Actions Progress Next Steps
1 Establish a Housing Stakeholder The Housing Stakeholder Reference Group has met a number of times with Reconvene the Housing Stakeholder Reference Group and seek assistance with
Reference Group to ensure relevant representation from government, not-for-profit, development and property communications, once there is a clear pathway for the proposed planning scheme
community and industry sectors and sectors. This group provides great expertise and is a very valuable amendments to be released for community consultation.
decision makers are informed and resource. Council is very appreciative of the time commitment given to date
represented. by members of this group.
2 Create an environment of collaboration Strategic Planners have been readily providing advice to development Following commencement of public notification of the proposed planning scheme
with developers and building sector proponents and encouraging broader housing choice. amendments in 2024, undertake workshops with the design and development
such that optimum solutions can be industry to work through development scenarios and potentially refine provisions if
Explanatory material and a planning scheme policy have been prepared to
reached. required.
assist with comprehension of the proposed planning scheme provisions.
3 Monitor other Australian local Strategic Planners continue to monitor both national and international Ongoing.
governments and relevant overseas examples with particular reference to regional areas with a strong tourism
examples as innovative approaches to sector. Connections have been made with comparable local governments
similar problems arise with useful learnings.
4 Ensure additional housing meets the Staff have analysed, reported on and made Council representations on the Advance the proposed planning scheme amendments to community consultation
SEQ Regional Plan dwelling targets set ShapingSEQ 2023 update. This included preparation and submission of a in 2024.
by the State by- Housing Supply Statement showing Noosa could meet the targets specified
Continue to work with UnityWater on capacity analysis on an ongoing basis.
without outward expansion beyond the Urban Footprint.
• Continuing discussions with State
government and utility providers Staff continue to work with DSDILGP and with UnityWater on dwelling
about dwelling capacity. capacity analysis, through to 2046, as final targets have yet to be published
(due by end 2023).
• Engaging with the State
Government on the SEQ Regional The proposed planning scheme amendments have reviewed the extent of
Plan review. the Tourist Accommodation zone and seek a greater supply of housing for
residents and greater yield of smaller dwellings and rely on both mandatory
• Ensuring appropriate land is zoned requirements and “opt in” incentives.
for housing development and
reviewing the optimum density or
capacity of land already zoned for
housing.
• Incentivising the optimum use of
the developable land that remains
so that a greater number of smaller
dwellings are delivered, rather than
high end low density
• Ensuring new housing capacity is
located in defined urban
boundaries rather than outward
expansion, with associated
Page 11 of 126
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.