MCU10/2083 Development Application part 2 - Attachment 5 - Traffic and Transport Assessment Report
Traffic & Transport Assessment -
Estimated Future Road Network Traffic Demands
6. Estimated Future Road Network Traffic Demands
6.1 Proposed Development Traffic Generation
The Department of Transport and Main Roads (DTMR) specifies in their Road Planning and Design
Manual (with reference to the NSW Roads and Traffic Authority’s Guide to Traffic Generating
Developments) appropriate traffic generation rates for commercial developments of this nature.
The estimated traffic generation for the proposed development based on these rates are presented
in Table 6.1.
Table 6-1 Proposed Development Peak Hour Traffic Generation Calculations
Thursday PM Peak Hour
GFA
Tenancy Land Use DTMR/RTA Land Use Peak Development Peak
(sqm)
Hour Traffic Generation Hour Traffic
165 Gourmet foods / Café 12 trips per 100 sqm GFA 19.8 trips (in+out)
1
74 Outdoor Dining Area 12 trips per 100 sqm GFA 8.88 trips (in+out)
2 144 Liquor 12.5 trips per 100 sqm GFA 18 trips (in+out)
3 143 Bank 20 trips per 100 sqm GFA 28.6 trips (in+out)
4 111 Convenience Store 12.5 trips per 100 sqm GFA 13.88 trips (in+out)
5 92 Pizza 12 trips per 100 sqm GFA 11.04 trips (in+out)
6 73 Noodles / Sushi 12 trips per 100 sqm GFA 8.76 trips (in+out)
7 100 Chicken 12 trips per 100 sqm GFA 12 trips (in+out)
87 Burgers 12 trips per 100 sqm GFA 10.44 trips (in+out)
8
24 Outdoor Dining Area 12 trips per 100 sqm GFA 2.88 trips (in+out)
Total 1013 134 trips (in+out)
Given the majority of land uses generate high-turnover traffic flows with durations of stay no longer
than 1 hour, it is envisaged that there will be a ratio of 50% inbound traffic and 50% outbound
traffic.
6.2 Estimated Development Traffic Distribution
The estimated traffic distributions for the proposed development are presented in Figure 6.1.
20%
35% 35%
SUBJECT SITE
LOCATION
10%
Copyright: 2010 Google – Map data
Figure 6-1 Estimated Development Traffic Distribution
The estimated traffic distribution and generation movements for the proposed development are
presented in Figure 6-2 and Figure 6-3 respectively.
CTLRNO_r01_v02_FINAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.