MCU10/2083 Development Application part 2 - Attachment 5 - Traffic and Transport Assessment Report
Traffic & Transport Assessment -
Existing Road Network Traffic Demands
5. Existing Road Network Traffic Demands
5.1 Existing Peak Period Traffic Surveys
Halcrow engaged AusTraffic to conduct peak period traffic surveys at the following locations during
4:00-6:00pm on Thursday 16th September 2010 respectively:
• Gibson Road / Thomas Street / Skipper Place intersection (all movements)
• Gibson Road / The Cockleshell intersection (turning movements only)
• Gibson Road / Site Access intersection (turning movements only)
The peak hour periods for the survey were found to be between 4:00-5:00pm on Thursday.
The results of the peak hour surveys are presented in Figure 5.1.
THOMAS ST
THE COCKLESHELL
206
469
240
8
27
14
70
20
5
0
668 5
2
0 GIBSON RD
12 2
654
8
4
20
0
67
0
0
2
0 416
23
SUBJECT KEEL CT
SITE
SKIPPER PL
Figure 5-1 Existing (2010) Gibson Rd Noosaville Road Network Peak Hour Traffic Volumes
5.2 Existing Surveyed Truck Movement Percentages
The percentage of truck movements surveyed within the road network was approximately 1% of
total traffic volumes.
5.3 Estimated Traffic Growth
It is estimated that future background traffic growth for the road network will be in the order of
approximately 2% per annum.
CTLRNO_r01_v02_FINAL 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.