Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2184Response_OM13_222

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

_ MAX WATTERSON+ASSOCIATES

CONSULTING SURVEYORS & PLANNERS

29" November, 2013
Your Ref: JLO13:JL:MCU12/0184
The Chief Executive Officer
Sunshine Coast Regional Council
Locked Bag 72
SUNSHINE COAST MAIL CENTRE Q 4560

Attention: Jack Lewis
Dear Sir,

Re: Council Resolution OM13/222
Development Application for Material Change of Use (MCU12/0184)
(Animal Husbandry Type 2) — Poultry Farm
Environmentally Relevant Activity (ERA12/0087)
Lot 21 on SP226606 — 136 Top Forestry Road, Ridgewood
Applicant: W Donald Milligan Pty Ltd.

| refer to the above-mentioned matter and provide the following information to clarify
the issues that were raised during the Ordinary Meeting held on the 14'" of November
2013.

1. Total vehicle trips including details of size of vehicles, purpose of trip,
time of trip and number of trips per day.

The daily distribution of vehicle trips throughout the 9 week (63 day) period is
variable according to the phase of the cycle.

A spreadsheet of the daily vehicle movements, the type of vehicle, the purpose of the
trip and the time spent at the site is attached as Appendix A. Please note that this is
the worst case scenario; with all sheds full of birds.

A summary of the vehicle movements is:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Number of Number of Frequency of Days
vehicles per day trips per day

0 0 30

1 2 14

2 4 13

3 6 1

4 8 0

5 10 0

6 12 0

7. 14 0

8 16 0

9 18 0

10 20 1

11 22 1

12 24 al

13 26 2
PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L. Watterson PH 07 5442 6121
Cadasiral Surveyor (Qld) FAX 07 5442 5125

B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
Log in to download the original file

2184Response_OM13_222.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 39 pages

Page 2

During the 63 day cycle:

On 30 days there are no trips generated.

On 14 days there are 2 trips generated.

On 13 days there are 4 trips generated.

On 1 day there are 6 trips generated.

There are only 5 days out of the 63 in which greater than 6 trips (that is, 3
vehicles) are generated each day

The vehicles used will include:
19m B-double

17m or 18m Semi-trailer
8m or 9m body truck
7m Light truck

Utility

Passenger vehicle

The purpose of the trips will be to:
Deliver shavings

Deliver feed

Deliver chicks

Collect dead birds

Live bird pick up

Carry forklift, foreman & crew
Litter removal

Shed washing

Shed sanitisation

The timing of the trips will vary throughout the day. The live bird pick-up will be
conducted in the early morning. Other deliveries will generally be made during the
hours of 8am to 4pm.

2. Feasibility of requirements to provide to seal to 50m in front of affected
properties on Top Forestry Road or to enter into an infrastructure
agreement with Council.

A Report prepared by MWA Environmental addressing the dust emission of the
vehicles along Top Forestry Road is attached as Appendix D; which concludes that
the additional vehicle movements will increase the overall particulate emissions from
Top Forestry Road by less than 10%; and will only “have a minor impact on dust level
at residences along Top Forestry Road”.

A Plan prepared by Callaghan & Toth showing the extent of Top Forestry Road to be
sealed within 50m of dwellings is attached as Appendix B. The Plans include 5
sections of the road totalling 381.1m located within 50m of dwellings. Please note
that the Plan is conceptual only, subject to further site surveys and subject to
analysis of the individual sites.

With respect to the sealing of Top Forestry Road the applicant proposes that a
Condition of approval be included that states:

Page 3

Top Forestry Road to be sealed to a maximum of 50m from dwellings; the extent of
the sealing to be determined following a detailed site survey, an analysis of the site
conditions and the preparation of an Operational Works application.

As a part of the investigation of the standard of Top Forestry Road it has been
disclosed that the bend at the front of No. 111 is of insufficient width to accommodate
two trucks to pass. Top Forestry Road is a school bus route and currently buses and
trucks use the road. It is possible that trucks and buses may be required to pass at
this bend currently.

The Plans prepared by Callaghan & Toth (Appendix B) also includes works required
to provide a width of the formation sufficient for 2 trucks to pass. The works include
the widening of the formation and stone pitched walls on each side of the Road; the
extent of the works is shown on Sheet 7 of the Plans.

The current situation is inadequate for the current traffic usage of the road; therefore
the applicant seeks to enter into an infrastructure agreement with Council to pay a
contribution of 50% of the cost of improvement of Top Forestry Road at this bend.

3. Composting and_ stockpiling methodology including data on
management of emissions during these processes.

In response to requests from Council staff MWA Environmental have provided a
review of the Noise, Dust & Odour assessment of the proposal; included in the
review is the modelling of the emissions with updated metrological, emission and
dispersion models utilizing the parameters provided by Pacific Environment Limited
(PEL) who conducted the technical review on behalf of Council.

It is noted that the updated modelling based upon PEL parameters “results in
significantly lower odour impact from the development as compared to the modelling
previously undertaken by MWA Environmental’.

A copy of the updated Report prepared by MWA Environmental is attached as
Appendix C.

It is also noted that several properties owned by the applicant are located within the
area impacted upon by odour; the applicant proposes the inclusion of the following
Condition or a similar Condition:

The poultry farm can only operate as long as Lots 20 & 22 on SP226606, Lot 1 on
SP100788 and Lot 204 on RP892484 are owned and occupied by the operator or an
employee of the poultry farm. In the event that the lands are not owned and
occupied by the operator or an employee of the poultry farm, the farm can only
operate when the odour limits are below 2.5 odour units.

Also prepared by MWA Environmental is a response to the Councillors request for
further information; which is enclosed herewith as Appendix D. The report provides
the methodology of the litter stockpiling, composting and spreading. The odour
modelling undertaken by MWA Environmental show that the cumulative impact of the
poultry sheds, the composting and compost spreading will comply with the
Queensland odour guideline at surrounding residential dwellings.

Page 4

The Report recommends that a Condition of approval be imposed that requires the
imposition of a Site-Based Environmental Management Plan (SBEMP); which
includes details of the measures required for the spreading of litter, the distribution
pattern, boundary setbacks and time of spreading.

4. Water quality management particularly addressing potential impacts
from the use of shed waste and composting material for fertilising the
orchard and any associated run off.

The litter is composted within 3 bunded areas; 300 lineal metres within a 120m x
22.5m bunded area: a reserve area of 76 lineal metres in a 82m x 14m bunded area
and a further reserve area of 110 lineal metres in a 75m x 14m bunded area.

Each batch will create approximately 1030m% of litter/compost; it is planned to spread
the compost for a depth of 0.1m for a width of 5m under the trees and landscaping.
Therefore the compost from each batch will provide 2,060 lineal metres (2.06kms) of
compost along the orchard rows or 12km of orchard rows per year. The orchard
includes in excess of 50kms of orchard rows therefore the composting operation will
only cover less than 25% of the total orchard rows per year.

The orchard currently includes a vegetated buffer located along the watercourses
and the spreading of the compost will only be undertaken within the orchard area; in
accordance with the current farming practice.

5. Feasibility on reduction of size and number of sheds

The applicant originally proposed the construction of 8 poultry sheds 160m long;
which is the industry standard; during the process of the application and detailed
design of the sheds and site the sheds have been reduced to average lengths of
105m.

The applicant has also undertaken to adopt to RSPCA stocking density 17.2 birds
per m?; therefore the maximum total number of birds possible at the site is 235,554.

The Queensland Farming Manger of Inghams has provided written confirmation that
most new facilities have a capacity of 240,000 birds and that a capacity of less than
200,000 may not be viable (Ref: Inghams Letter, 25/11/13 — Appendix E). This
proposal allows for a maximum of 235,554 birds to be on site. The scale of this
proposal is already reduced from what was envisaged at the concept stage when
sheds with a length of 160m were considered.

| trust that this information provides the additional information required for the
assessment of the Development Application.

Do not hesitate to contact this office if you require any further information.

Yours faithfully

Mb

‘Max Watterson

Page 5

APPENDIX A

Details of Maximum Movements per Batch Cycle (63 Days) for 8 sheds

Page 6

           Milligan Farms - Proposed Chicken Meat Farm - Maximum Vehicle Movements Per Batch Cycle (63 Days) for 8 Sheds
                                                                         Approx. time of                                                               Total actual trips
                              Day             Number of Vehicles                                              Purpose of Trip        Type of Vehicle                            Total per Wk   Council's Est / Wk
                                                                         trip/time on site                                                                generated
                                1                     3            Between 8am-4pm - 30 mins                  Deliver shavings                                 6
                                2                     2            Between 8am-4pm - 30 mins                  Deliver shavings                                 4
                                3                     2             Time nominated - 50 mins                    Deliver feed                                   4
       WEEK 1                   4                     2               9:30am-4pm - 2-3 hrs                     Deliver chicks                                  4
                                5
                                6
                                7                                                                                                                                                   18                30

                                1                     1              Time nominated - 50 mins                    Deliver feed                                  2
                                2                     1              Time nominated - 50 mins                    Deliver feed                                  2
                                3                     1              Time nominated - 50 mins                    Deliver feed                                  2
       WEEK 2                   4
                                5
                                6
                                7                                                                                                                                                    6                 8

                                1                     2             Time nominated - 50 mins                    Deliver feed                                   4
                                2                     2             Time nominated - 50 mins                    Deliver feed                                   4
                                3                     1             Arranged time - 20-30 mins                 Loss collection                                 2
       WEEK 3                   4
                                5
                                6
                                7                                                                                                                                                   10                12

                                1                     1              Time nominated - 50 mins                    Deliver feed                                  2
                                2                     2              Time nominated - 50 mins                    Deliver feed                                  4
                                3                     2              Time nominated - 50 mins                    Deliver feed                                  4
       WEEK 4                   4
                                5                     1             Arranged time - 20-30 mins                 Loss collection                                 2
                                6
                                7                                                                                                                                                   12                14

                                1                     2              Time nominated - 50 mins                   Deliver feed                                  4
                                2                     2              Time nominated - 50 mins                   Deliver feed                                  4
                                3                     2              Time nominated - 50 mins                   Deliver feed                                  4
                                4                     1              Time nominated - 50 mins                   Deliver feed                                  2
       WEEK 5                   5                     8            Can start as early as 2:30am - 40 mins     Live bird pick-up                               16
                                                      1                                                      Carry forklift & crew                            2
                                                      1                                                     Carry foreman & crew                              2
                                6
                                7                                                                                                                                                   34                22

                                1                     8            Can start as early as 2:30am - 40 mins     Live bird pick-up                               16
                                                      1                                                      Carry forklift & crew                            2
                                                      1                                                     Carry foreman & crew                              2
                                                      1             Arranged time - 20-30 mins                 Loss collection                                2
                                2                     2             Time nominated - 50 mins                    Deliver feed                                  4
       WEEK 6
                                3                     2             Time nominated - 50 mins                    Deliver feed                                  4
                                4
                                5                     1             Arranged time - 20-30 mins                 Loss collection                                 2
                                6
                                7                                                                                                                                                   32                70

                                1                     1              Time nominated - 50 mins                   Deliver feed                                   2
                                                      1            Arranged time - 20-30 minutes               Loss collection                                 2
                                2
                                3
                                4                    10            Can start as early as 2:30am - 40 mins     Live bird pick-up                               20
                                                      1                                                      Carry forklift & crew                             2
                                                      1                                                       Foreman & crew                                   2
       WEEK 7
                                5                    10            Can start as early as 2:30am - 40 mins     Live bird pick-up                               20
                                                      1                                                      Carry forklift & crew                             2
                                                      1                                                       Foreman & crew                                   2
                                                      1            Arranged time - 20-30 minutes               Loss collection                                 2
                                6
                                7                                                                                                                                                   54                68


                                1                    11            Can start as early as 2:30am - 40 mins     Live bird pick-up                               22
                                                      1                                                      Carry forklift & crew                             2
                                                      1                                                       Foreman & crew                                   2
                                2                     1            Arranged time - 20-30 minutes               Loss collection                                 2
       WEEK 8
                                3
                                4
                                5
                                6
                                7                                                                                                                                                   28                32

                                1                     1                                                        Shed cleaning                                   2
                                2                     1                                                        Shed cleaning                                   2
                                3                     1                                                        Shed cleaning                                   2
       WEEK 9                   4                     1                                                        Shed cleaning                                   2
                                5                     1                                                       Shed sanitisation                                2
                                6
                                7                                                                                                                                                   10                92


19m B-Double                                                            TOTAL VEHICLE MOVEMENTS PER BATCH:                                                  204                     204               348
17 or 18m Semi                                                                                                                                         average trips per week       23                39
8 or 9m Body Truck                                *Truck arrival times are generally flexible, except during live bird pick-up
7m Light Truck            * 30 days of the 63 day cycle generate no vehicle movements, with the exception of permanent staff
Ute with Trailer      * No allowance made for trucks removing litter as it stays on-site. If taken off-site, allow for 12 semis (24 movements) in Week 9.
Passenger vehicle

Page 7

APPENDIX B

Proposed Top Forestry Road Improvements to Access Lot 21 on
SP226606

prepared by Callaghan & Toth

Page 8

 

 

 

    
  
     
  
 
 
 
 
 
     
  
 

PLAN INDEX

1209-20 A SITE PLAN
1209-21 A PROPOSED TOP FORESTRY ROAD IMPROVEMENTS LAYOUT PLAN 1
1209-22 A PROPOSED TOP FORESTRY ROAD IMPROVEMENTS LAYOUT PLAN 2
1209-23 A PROPOSED TOP FORESTRY ROAD IMPROVEMENTS LAYOUT PLAN 3
1209-24 A PROPOSED TOP FORESTRY ROAD IMPROVEMETNS LAYOUT PLAN 4
1209-25 A PROPOSED TOP FORESTRY ROAD IMPROVEMENTS LAYOUT PLAN 5
1209-26 A BEND DETAIL AND TYPICAL CROSS SECTION

 

 

“Top Furey Ay

2
Top Forested

1209-21

 

1209-25

NOTE: CONCEPTUAL ONLY & SUBJECT TO DETAILED SURVEY

Callaghan & Toth )

| Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road

Phone 54749081, Fox 54749041

www.callaghanandtoth.com.au

datum AHD DERIVED

.. PSM 120517
Origin (B.M.) RL 187.09

 

 

designed [AN
drawn MM.
checked | ADT

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[rao 54 426 121

_———
project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS
LOT 21 ON SP226606

ld

($$ <~r
Client

 

DAVID MILLIGAN

TS)

—————————————————
title

SITE PLAN

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

En

_————
SCALE

 

Q 20 40 60 80 100 Meters 200
ee

scale SCALE SHOWN IS ORIGINAL DRAWING SCALE
. DO _NOT SCALE FROM THIS DRAWING
1:4000(A3) USE ONLY DIMENSIONS PROVIDED

 

 

REVISIONS

A | AMENDED SCALE

 

FILES

 

COMPUTER DIRECTORY

 

X\JOBS\CT\...

 

 

NOT POR CORSTROCTON

 

Sheet 1 of 7 sheets

 

drawing number

1209-20

 

 

 

 

XK dote 27th NOVEMBER 2013 J

 

 

 

 

Page 9

LEGEND: PROPOSED SERVICES

es

TOP OF BANK
BUILDING

TABLE DRAIN
GRAVEL ROAD

CONTOUR

VEGETATION

2 COAT BITUMEN SEAL
6m WIDE

50m RADIUS SHOWING
SEAL EXTENT

JOINS PLAN 1209-22

NOTE: CONCEPTUAL ONLY & SUBJECT TO DETAILED SURVEY

Callaghan & Toth

. | Civil, Environmental &
| Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au

datum AHD DERIVED
PSM 120517

SURVEYED BY
MAX WATTERSON & ASSOCIATES
PHONE 54 426 121

project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS
LOT 21 ON SP226606

Client

DAVID MILLIGAN

title

PROPOSED TOP FORESTRY ROAD!
IMPROVEMENTS LAYOUT PLAN 1

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

10 15 20 25 Meters 50

scale ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) B0_NOT SCALE FROM THIS DRAWING
: USE ONLY DIMENSIONS PROVIDED

REVISIONS

revision details

FILES

COMPUTER DIRECTORY
X\JOBS\CT\...

re

Sheet 2 of 7 sheets

drawing number

1209-21

 

Page 10

LEGEND: PROPOSED SERVICES

es

TOP OF BANK
BUILDING

TABLE DRAIN
GRAVEL ROAD

CONTOUR

VEGETATION

2 COAT BITUMEN SEAL
6m WIDE

50m RADIUS SHOWING
SEAL EXTENT

NOINS PLAN _ 1209-25)

Callaghan & Toth

. | Civil, Environmental &
| Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au

datum AHD DERIVED
PSM 120517

SURVEYED BY

MAX WATTERSON & ASSOCIATES
PHONE 54 426 121

project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS
LOT 21 ON SP226606

Client

DAVID MILLIGAN

title

PROPOSED TOP FORESTRY ROAD!
IMPROVEMENTS LAYOUT PLAN 2

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

10 15 20 25 Meters 50

scale ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) B0_NOT SCALE FROM THIS DRAWING
: USE ONLY DIMENSIONS PROVIDED

REVISIONS

revision details

FILES

COMPUTER DIRECTORY
X\JOBS\CT\...

Sheet 3 of 7 sheets
drawing number

1209-22

 

Page 11

Callaghan & Toth

TOP OF BANK . | Civil, Environmental &
BUILDING | Hydraulic Engineers

a 2 PO BOX 2305

TABLE DRAIN 7 a " NOOSA HEADS 4567
. y ’ 8/41 Sunshine Beach Road

GRAVEL ROAD . ; Phone 54749081, Fax 54749041
www.callaghanandtoth.com.au

L, , ‘ : , . datum AND DERWED
CONTOUR : J PSM 120517

VEGETATION

SURVEYED BY
MAX WATTERSON & ASSOCIATES
PHONE 54 426 121

LEGEND: PROPOSED SERVICES

2 COAT BITUMEN SEAL yy | saae = . project

6m WIDE PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS

50m RADIUS SHOWING 7 af d LOT 21 ON SP226606
SEAL EXTENT - ae

Client

DAVID MILLIGAN

title

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS LAYOUT PLAN 3

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

10 15 20 25 Meters 50

scale ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) B0_NOT SCALE FROM THIS DRAWING
USE ONLY DIMENSIONS PROVIDED
REVISIONS

f revision details

FILES

COMPUTER DIRECTORY
X\JOBS\CT\...
fd

Sheet 4 of 7 sheets

drawing number

1209-23

NOVEMBER 2013

 

Page 12

LEGEND: PROPOSED SERVICES

TOP OF BANK
BUILDING

TABLE DRAIN
GRAVEL ROAD

CONTOUR

VEGETATION

2 COAT BITUMEN SEAL
6m WIDE

50m RADIUS SHOWING
SEAL EXTENT

JOINS PLAN _1209=25

DETAILED SURVEY

Callaghan & Toth

. | Civil, Environmental &
| Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au

datum AHD DERIVED
PSM 120517

SURVEYED BY

MAX WATTERSON & ASSOCIATES
PHONE 54 426 121

project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS
LOT 21 ON SP226606

Client

DAVID MILLIGAN

title

PROPOSED TOP FORESTRY ROAD!
IMPROVEMENTS LAYOUT PLAN 4

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

10 15 20 25 Meters 50

scale ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) B0_NOT SCALE FROM THIS DRAWING
: USE ONLY DIMENSIONS PROVIDED

REVISIONS

f revision details

FILES

COMPUTER DIRECTORY
X\JOBS\CT\...

re

Sheet 5 of 7 sheets

drawing number

1209-24

 

Page 13

TOP OF BANK
BUILDING

TABLE DRAIN
GRAVEL ROAD

CONTOUR

VEGETATION

2 COAT BITUMEN SEAL
6m WIDE

50m RADIUS SHOWING
SEAL EXTENT

NOTE: CONCEPTUAL ONLY & SUBJECT TO DETAILED SURVEY

Callaghan & Toth

\ Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

8/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au

jatum AHD DERIVED
PSM 120517

SURVEYED BY
MAX WATTERSON & ASSOCIATES
PHONE 54 426 121

project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS
LOT 21 ON SP226606

Client

DAVID MILLIGAN

title

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS LAYOUT PLAN 5

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

0.5 10 15 20 25 Meters 50
ee

scale ‘SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:1000(A3) B0_NOT SCALE FROM THIS DRAWING
: USE ONLY DIMENSIONS PROVIDED

REVISIONS
t

deti
ADDED NOT FOR CONSTRUCTION NOTE

FILES

COMPUTER DIRECTORY
KA\JOBS\ CTY.

date 27th NOVEMBER 2013

 

Page 14

 

 

DATUM R.L.116.000

 

 

4.00

4.94

XTENT OF CONCRETE VEE_DRAIN

STONE PITCHED RETAINING WALL

 

STONE PITCHED RETAINING WALL

 

SECTION A-A

scale
1:100(A3)

 

 

NOTE: CONCEPTUAL ONLY & SUBJECT TO DETAILED SURVEY

 

Callaghan & Toth

Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

i! 8/41 Sunshine Beach Road

= Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au

designed | AH datum AHD DERIVED

drawn MM . PSM. 120517
checked [ADT | Origin (BM) RL 187.09

 

 

 

 

 

 

approved
SURVEYED BY

MAX WATTERSON & ASSOCIATES
[rao 54 426 121

_———
project

PROPOSED TOP FORESTRY ROAD
IMPROVEMENTS TO ACCESS

LOT 21 ON SP226606

ld

($$ <~r
Client

 

DAVID MILLIGAN

TS)

—————————————————
title

BEND DETAIL &

CROSS SECTION A-A

_————

LOT 21 on SP226606

Parish of TUCEKOI

County of MARCH
SUNSHINE COAST COUNCIL
Locality of RIDGEWOOD

En
_————

 

SCALE
0.1.25 2.5 3.7/5 5 6.25 Meters 12.5
SSS

scale
5 SCALE SHOWN IS ORIGINAL DRAWING SCALE
1:250(A3) 0 'NoT SCALE. FROM THIS. DRAWING

\ USE_ONLY_DIMENSIONS PROVIDED. }

 

 

REVISIONS

i le
A | ADDED NOT FOR CONSTRUCTION NOTE |11/13)

FILES

 

COMPUTER DIRECTORY

 

X\JOBS\CT\...

 

 

NOT POR CORSTROCTON

 

Sheet 7 of 7 sheets

 

drawing number

1209-26

 

N

 

 

 

XK dote 27th NOVEMBER 2013 J

 

 

 

 

Page 15

APPENDIX C

Response to Sunshine Coast Regional Council Officers Request for
Further Information — Noise, Dust & Odour Issues

Prepared by MWA Environmental

Page 16

Ref:   L26013/BH/12-002


29 November 2013


W Donald Milligan Pty Ltd
124 Top Forestry Road
Ridgewood QLD 4563

Attention:    Mr David Milligan


Dear David


Re: Response to Sunshine Coast Regional Council Further Information
    Request of 19 November 2013–
    Noise, Dust & Odour Issues -
    Proposed Poultry Growing Sheds, Ridgewood

Further to your request, MWA Environmental has reviewed the further information
requested by Council Officers (“the technical review matters”) by email on 19
November 2013 in relation to the proposed poultry farm at 124 Top Forestry Road,
Ridgewood.

Responses to each of the technical review matters raised by Council Officers by
email on 19 November 2013 are provided in the following sections.

It is noted that, to ensure that SCRC is satisfied with the modelling, an updated
meteorological, emission and dispersion models have been prepared in accordance
with the preferences of Pacific Environment Limited (“PEL”) who conducted the
technical review. MWA Environmental has consulted with PEL in relation to the
responses and updated model to ensure that the technical review matters are
adequately addressed.

A summary of the model updates is provided in Attachment 1.

The results of the updated model are provided in Attachment 2.

The results of the updated model indicate that the cumulative impact of the poultry
growing sheds and litter stockpiling can comply with the Queensland odour guideline
at surrounding residences. The updated modelling based upon PEL emissions and
modelling preferences results in significantly lower odour impact from the
development as compared to the modelling previously undertaken by MWA
Environmental.




                       Max Winders & Associates Pty Ltd tas MWA Environmental
                 Level 15, 241 Adelaide St, Brisbane GPO BOX 3137, Brisbane Qld 4001
                       P 07 3002 5500 F 07 3002 5588 E [email protected]
                                       W www.mwaenviro.com.au
                                         ABN 94 010 833 084

Page 17

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002


1.   Please provide a response and or revise the modelling you performed with regard to the
     following points:
a.   How the year 2008 was determined to be representative of long term weather patterns;

A brief analysis of the Year 2008 compared to long-term average conditions at the
nearest Bureau of Meteorology station (Tewantin) is provided in Attachment 3.

The analysis indicates that the Year 2008 is sufficiently representative of long-term
trends to be applied for the purpose of this assessment. There are variations in the
frequency of winds from various directions and speeds as compared to long-term
averages but these are evident for any year when compared to long-term averages.

The odour objective being assessed relates to the 44th ‘worst’ 1 hour periods of each
year for each receptor location. The ‘worst’ conditions for odour dispersion are
typically associated with lower (less than 3 metre per second) wind speed conditions.
The analysis indicates that wind speeds during 2008 were lower than long-term
averages and thus may be considered a conservative year in this regard.


b.   The effect of the radius of influence on Station 1 in TAPM being set at 15 km;

The radius of influence for the Nambour station is the TAPM observation nudging
dataset has been updated to 5km as per the request from PEL (per email 25
November 2013).


c.   Whether the vegetation resolution in the inner domains affects the model output.

MWA Environmental provided information regarding the land use dataset to PEL by
email on 21 November 2013. Subsequent advice from PEL (per email 25 November
2013) is that the land use data supplied appeared appropriate.


d.   Why the Teixeira algorithm was used in CALMET

The CALMET model has been updated to apply the ‘MM5toGrads algorithm’
(ICLOUD=4) as per request from PEL (per email 25 November 2013).


e.   Whether the THRESHL setting of 0 in CALMET has produced spurious mixing heights at
     dawn and dusk

The THRESHL value of 0 was applied by MWA Environmental in accordance with
the recommended setting from Generic Guidance and Optimum Model Settings for
the CALPUFF Modeling System for Inclusion into the ‘Approved Methods for the
Modeling and Assessments of Air Pollutants in NSW, Australia’ (TRC for NSW OEH,
2011). Box and whisker plots of the mixing heights by hour of day are presented in
Attachment 4 for review. The results appear reasonable to MWA Environmental.




                                               2

Page 18

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



f.   Why WSCALM was set at 0.2 m/s

WSCALM was set to a value of 0.2m/s to account for plume transport during the
approximate 100 hours of wind speeds predicted by the meteorological model to be
above 0 m/s but below 0.5m/s. This notwithstanding, the updated modelling has
been conducted with a WSCALM value of 0.5m/s as per request from PEL (per email
25 November 2013).


g.   What the influence of thermal buoyancy on emissions would have on predicted impacts
     at nearby receptors above the height of the sheds (i.e. the site should be modelled to
     evaluate this).

In accordance with PEL request, representation of emissions has been updated to be
as buoyant point sources in accordance with the method presented in the Best
Practice Guidance for the Poultry Industry – Plume Dispersion Modelling and
Meteorological Processing (PAE Holmes for DEEDI, May 2011).

This amended source representation considers thermal buoyancy by way of
representing emissions at the predicted release temperature of air from the sheds for
each hour of the batch cycles. Vertical mechanical momentum has been excluded
using a momentum flux factor of 0 (rain hat function).            The point source
characteristics have been set with varying emission velocity by hour as a function of
the ventilation rate divided by the cross sectional area of the effective 16.5m
diameter point source.

It is our understanding that this representation is in accordance with the
recommendations of PEL.


h.   What the impact would be of setting the initial vertical dispersion at 6 m for a building
     with a total height of 5 m (both odour and dust).

As above, the emissions representation has been updated to point sources in
accordance with the recommendations of PEL. This issue is therefore no longer
relevant.


i.   What the impact would be of setting the initial vertical dispersion as modelled for the
     litter sources rather than a more representative value for stockpile heights

MWA Environmental had previously modelled SIGZI 0.35 (1.5m stockpile height
divided by 4.3) as a conservative representation. This has been updated to SIGZI
0.70 (1.5m stockpile height divided by 2.15) for a ground level source as per
modelling guidance.




                                               3

Page 19

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



2.   In regard to estimating the emissions from the sheds, Pacific Environment note that the
     K factor used for the modelling of 2 should have been 2.2 to follow the
     recommendations in the Queensland Meat Chicken Guideline. This would increase
     predicted impacts by 10% assuming that the impacts of potential changes with the
     clarifications required above do not change the model results further. Please amened
     your modelling to include the appropriate K factor.

In accordance with PEL request, the broiler emission rate model has been updated in
accordance with the method presented in the Best Practice Guidance for the Poultry
Industry – Plume Dispersion Modelling and Meteorological Processing (PAE Holmes
for DEEDI, May 2011). Specific updates were to consider a ‘K Factor’ of 2.2 (i.e. with
10% factor of safety) and a maximum ventilation rate of 10m3/hour/bird.

The odour emission rates are lower when calculated in accordance with the PEL
recommendations (i.e. Best Practice Guidance document method) due to the
conservatively high maximum ventilation rates that were previously adopted by MWA
Environmental.


3.   The sensitive receptors used in the report, do not take into consideration the impacts on
     146 (which includes a house), 124, 172 or 224 Top Forestry Road. These lots could be
     sold off by the applicant and a house constructed on each of them. Please either indicate
     whether the applicant is willing to accept a condition about amalgamating the lots in to
     the larger lot (136 Top Forestry Road), otherwise include appropriate modelling
     indicating that these separate lots ‘sensitive receptors’ will not be affected by the
     cumulative odour impacts.

The results of the updated odour modelling (refer to Attachment 2 and response to
issue 4. below) indicate that odour impacts may exceed the Queensland odour
guideline on several adjacent properties owned by the applicant.

Advice from Gantt Legal is that a lawful condition can be imposed to address odour
impacts at the abovementioned adjoining lands, specifically that:

     “A condition could be imposed to the effect that the poultry farm can only operate as
     long as the adjoining lands are owned and occupied by the operator or an employee of
     the poultry farm. In the event that the adjoining lands are not owned and occupied by
     the operator or an employee of the poultry farm, then a condition of approval could
     require odour limits not to be exceeded at those adjoining lands. “




                                               4

Page 20

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



4.    Provide a response to the assertion from Pacific Environment that with regard to the flux
      chamber method, recent research including Parker et. al (2009) and Hudson & Ayoko
      (2008) have both concluded that for gas phase controlled odorants, the use of the flux
      chamber can under predict emissions. The emission rate reported in the Golder report
      was 350 ou/m2/min (5.8 ou/m2/sec). The aged stockpile OER was reported as on
      average 3,200 ou/m2/min (53 ou/m2/sec) which is ten times higher than that used for
      the modelling for the stockpiles.

The poultry litter stockpiles measured at Queensland Organics for the purpose of the
Narangba Industrial Estate Health Risk Assessment were for both ‘fresh litter
stockpiles’ and ‘aged litter stockpiles’. The ‘aged litter stockpile’ odour emissions are
not expected to be relevant to the mechanically turned windrow system proposed to
be operated at the subject site. The aged litter stockpiles would have been stagnant
bulk stockpiles stored for an extended period without turning, resulting in anaerobic
conditions which significantly increase odour emission rates.

The proposed operation involves mechanical turning using a compost turning
machine on an approximate weekly basis. This mechanical turning procedure allows
sufficiently aerobic conditions to be maintained which reduces odour emission rates.
For this reason, the ‘fresh litter stockpiles’ odour emission rate of 350 OU/m2/minute
measured for the Queensland Health Study was considered to be most applicable.
MWA Environmental also notes that for the two ‘aged litter stockpile’ samples taken
for the Queensland Health study, odour emission rates measured at 3200
OU/m2/minute and 580 OU/m2/minute. Thus, average odour emission rates from the
‘aged litter stockpiles’ were not actually ten times higher than the ‘fresh litter’ sample
emission rate considered appropriate and modelled by MWA Environmental.

MWA Environmental has compared the adopted litter composting odour emission
rate of 350 OU/m2/minute (5.8 OU/m2/second) to published odour emission rates
from other composting facilities, as follows:

     MWA Environmental Adopted:                        5.8 OU/m2/second
     Effective Peak SOER from Litter in Shed1: 11            OU/m2/second under forced
                                                             ventilation   conditions  and
                                                             including bird odour - no flux
                                                             hood sampling issues
     Woy Woy Report (URS)2:                            1.25 OU/m2/second for composting
                                                            windrows
     Woy Woy Report (URS):                             4.5 OU/m2/second for mature compost
                                                            as measured by wind tunnel




1
  23800 / 2080 = 11 based upon peak 23800 OU/s from largest shed with litter surface area of
       2
2080m , also includes bird odour
2
  Woy Woy Waste Management Facility Air Quality Impact Assessment (URS, August 2007)
referencing measurements of covered windrows published in “Kühner M, Fischer IK, (1999)
Composting with Covers as an alternative to conventional (traditional) decomposting of organic
matter in 75th Colloquium of Waste – Practical Report 25.03.1999”


                                                 5

Page 21

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



    GHD Covered Windrow3:                             Average 0.4 OU/m2/second                 for
                                                           covered windrow
                                                      Peak     1.2 OU/m2/second for           top
                                                             section of covered windrow
    ERM Gerogery4:                                    Varying odour emission from Week 1
                                                            to Week 5 including flux hood
                                                            correction, as follows:

Table 1: Surface Odour Emission Rate Derived from ERM Gerogery
         Actual SOER for Full Surface of Stockpiles
         With Flux Hood Correction Factor5

                                                Surface Odour Emission Rate - OU/m2/sec
              PARAMETER
                                             Week 1      Week 2     Week 3     Week 4      Week 5
     SOER Measured by Flux Hood                 7.7          1.1      0.36       0.85       0.07
    Correction for Flux Hood Diversion         13.9       13.9        13.9       13.9        4.6
             Modelled SOER                    107.0       15.3        5.0        11.8        0.3



Whilst the above comparative data does not definitively quantify odour emissions
from the proposed stockpiling activities, the data does indicate that the MWA
Environmental modelled odour emission rates are comparable to published data for
composting windrows, including measurement by wind tunnel instead of flux hood
sampling.

The updated modelling has considered the overall odour impacts from the proposed
development including the following litter stockpile odour emission rate scenarios:

    A. Poultry Sheds Only i.e. no litter stockpiling
    B. Previously applied stockpile odour emission rate of 5.8 OU/m2/second;
    C. Stockpile odour emission rate of 53.3 OU/m2/second based upon the ’10
       times higher’ aged stockpile sample referenced in the SCRC information
       request; and
    D. Stockpile odour emission rates as per Table 1 above (derived from ERM,
       2013) varying from 107 OU/m2/second for Week 1 to 0.3 OU/m2/second for
       Week 5.

The results of the modelling are presented in Attachment 2.



3
  Pollock, T. (2009) Odour Emission rate Measurements on Green-waste Windrows, 19th Int. Clean Air
& Environment Conference.
4
  Resource Recovery Facility – Gerogery - Odour Impact Assessment (Environmental Resources
Management Australia, August 2013) including references to Environmental Impact Statement
(Report Number 31/29006/180436 - Organic Compost Facility Environmental Impact Statement, (GHD,
October 2012)
5
  Correction factors were noted by the author to be likely overestimates due to the method applied


                                                6

Page 22

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



The results of the updated odour modelling demonstrate that, for each of the above
stockpile odour emission rate scenarios, cumulative odour impacts will comply
with the Queensland odour guideline at surrounding residential dwellings.

The Scenario C at 53.3 OU/m2/second odour emission rate based upon the ‘10 times
higher’ sample referenced in the SCRC information request is not considered to be
valid for reasons stated above.

The results of the modelling for Scenario B and Scenario D have been considered in
the context of the other properties owned by the applicant at 146, 124, 172 and 224
Top Forestry Road, as follows:

     •   Using the Scenario B odour emission rate (as per MWA report) a house could
         be constructed outside of the odour guideline contour at 124 & 224 Top
         Forestry Road. The existing house at 146 Top Forestry Road and all
         potential house sites at 172 Top Forestry Road would not comply with the
         Queensland odour guideline.
     •   Using the Scenario D odour emission rate (as per MWA report) a house could
         be constructed at the southeastern parcel of 124 Top Forestry Road at a
         location compliant with the odour guideline. The only location available at
         224 Top Forestry Road for a dwelling is within the electrical easement. The
         existing house at 146 Top Forestry Road and all potential house sites at 172
         Top Forestry Road would not comply with the Queensland odour guideline.

Discussion of potential options to address Council officer concerns in relation to
houses on the affected properties that are owned by the applicant is contained in the
response to 3. above.


5.   There is no information about the potential cumulative impacts be of the odour from the
     sheds, composting/stockpiling and the spreading on the sensitive receptors. Please
     provide additional information about the cumulative odour impacts of spreading the
     stockpiled manure on the farm.

The odour model has considered the cumulative impacts associated with the poultry
growing sheds and the litter stockpiling/composting. As discussed with Council
officers at a meeting held on 20 November 2013, it is not considered feasible to
model cumulative odour impacts from the spreading of litter because the locations
and times of spreading will vary under differing meteorological conditions at various
times. Rather the spreading of the litter should be done in accordance with
management practices that minimise potential off-site impacts.




                                               7

Page 23

Mr David Milligan, W Donald Milligan Pty Ltd                                   29 November 2013
Re: Response to Sunshine Coast Regional Further Information Request of 19 November 2013 – Noise,
      Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                               L26013/BH/12-002



Development approvals for poultry farms typically include a condition requiring the
implementation of a Site-Based Environmental Management Plan (SBEMP) prior to
the commencement of use. This Site-Based Environmental Management Plan
should specify management measures to minimise the risk of odour nuisance from
the spreading of litter, such as:

•   Spreading of litter within 4 to 5 weeks of clean-out from the poultry sheds to
    ensure that odour emissions from the spreading of litter do not coincide with peak
    odour emission periods from the next batch of birds in the poultry sheds.
•   Litter from each batch to be spread in a distributed manner across the
    orchard so as to not concentrate odours to a particular boundary of the site. The
    applicant has advised that the available litter from the poultry sheds will not be
    sufficient to spread over all areas of the site in a year i.e. not all areas of the site
    will be covered in a year.
•   Maintaining spreading areas at a minimum setback of 50 metres from the
    southern, eastern and northern property boundaries to minimise potential
    near-field odour influences on adjacent properties. This will provide a minimum
    buffer distance of 300 metres from spreading areas to a residential dwelling.
•   Spreading of litter only when prevailing winds are from the northeasterly to
    southeasterly sector as required to minimise odour transport from the spreading
    process.
•   Use of appropriate low velocity spreading equipment to minimise release of
    dust (and associated odours) into the atmosphere.
•   Dampening of applied litter during high wind speed periods to minimise
    potential fugitive dust (and odour) emissions.
•   Corrective actions in the event of odour nuisance, including:
        •   Review of spreading locations, methods and practices to identify measure
            to reduce impacts; and
        •   If necessary, export of litter from site if noted to generate excessive odour
            emissions.

With the available 300 metre separation distance from spreading areas to
surrounding residences it is considered that implementation of the above
management measures in accordance with a SBEMP will ensure that the activity
does not cause unreasonable odour nuisance.

Yours sincerely




Ben Hyde
Environmental Engineer




                                               8

Page 24

                                                       ATTACHMENT 1




      Max Winders & Associates Pty Ltd tas MWA Environmental
Level 15, 241 Adelaide St, Brisbane GPO BOX 3137, Brisbane Qld 4001
      P 07 3002 5500 F 07 3002 5588 E [email protected]
                      W www.mwaenviro.com.au
                        ABN 94 010 833 084

Page 25

      SUMMARY OF MODEL UPDATES TO ADDRESS SCRC TECHNICAL REVIEW
            MATTERS RAISED BY PACIFIC ENVIRONMENT LTD (PEL)

TAPM

  •    Radius of influence of Nambour observation station set to 5km (as per PEL request)

CALMET

  •    updated to apply the MM5toGrads algorithm (ICOULD=4) as per request from PEL
       (per email 25 November 2013)
  •    updated the Radius of Influence of Terrain Features (TERRAD) from 2km to 5km to
       match the range of suitable values in accordance with the NSW CALPUFF Modelling
       Guidance Document

CALPUFF

  •    WSCALM was set to a value of 0.5m/s (as per PEL request)
  •    Model representation of poultry shed emissions amended to buoyant point sources
       (as per PEL request), specifically:
          o   16-16.5m source diameter offset 30m from the ventilation end of each shed
          o   Note momentum flux factor set to 0 (rain hat function)
          o   Effective emission velocity calculated for each hour based upon the
              ventilation rate
          o   Emission temperature set in accordance with the Best Practice Guidance for
              the Poultry Industry document
  •    Set the minimum turbulence velocities (SVMIN) set to 0.2 over land for each stability
       class in accordance with the NSW CALPUFF Modelling Guidance Document
  •    Set the Probability Density Function (PDF) used for dispersion under convective
       conditions to 1 in accordance with the NSW CALPUFF Modelling Guidance
       Document


       A sensitivity test was undertaken to evaluate the impact of changing SIGZI for 1.5m
       high litter stockpiles from 0.35 to 0.7 for ground level sources (as per review
       requested by PEL). No change in the overall concentrations was identified for the
       discrete receptor model at the sensitive receptors, therefore this was not adopted in
       running the gridded receptors.

EMISSION RATES


  •    ‘K Factor’ of 2.2 applied in accordance with the Best Practice Guidance for the
       Poultry Industry document
  •    Maximum ventilation rate set at 10m3/hour/bird in accordance with the Best Practice
       Guidance for the Poultry Industry document

Page 26

                                                       ATTACHMENT 2




      Max Winders & Associates Pty Ltd tas MWA Environmental
Level 15, 241 Adelaide St, Brisbane GPO BOX 3137, Brisbane Qld 4001
      P 07 3002 5500 F 07 3002 5588 E [email protected]
                      W www.mwaenviro.com.au
                        ABN 94 010 833 084

Page 27

                                        Poultry Sheds Only

                         Updated Odour Model
                         Standard Stocking Scenario
   Figure A


                   1-hour average 99.5th percentile predicted odour concentrations


Ridgewood 12-002     Guideline: 2.5 Odour Units           29 November 2013

Page 28

                                  Poultry Sheds + Litter Stockpiles

                         Updated Odour Model
                         Standard Stocking Scenario
   Figure B              5 Week Litter Stockpiles as per MWA report (5.8 ou/m2/s)



                   1-hour average 99.5th percentile predicted odour concentrations


Ridgewood 12-002     Guideline: 2.5 Odour Units           29 November 2013

Page 29

                          Poultry Sheds + Litter Stockpiles “10 x Emission”

                         Updated Odour Model
                         Standard Stocking Scenario
                         5 Week Litter Stockpiles (53.3 ou/m2/s) as per Golder
   Figure C               ‘aged stockpiles’ – Not considered by MWA
                          Environmental to be appropriate


                   1-hour average 99.5th percentile predicted odour concentrations


Ridgewood 12-002     Guideline: 2.5 Odour Units            29 November 2013

Page 30

                     Poultry Sheds + Litter Stockpiles “ERM Varying Emission”

                         Updated Odour Model
                         Standard Stocking Scenario
   Figure D              5 Week Litter Stockpiles with Varying Emissions for as
                          per Gerogery ERM report with Flux Hood Correction



                   1-hour average 99.5th percentile predicted odour concentrations


Ridgewood 12-002     Guideline: 2.5 Odour Units           29 November 2013

Page 31

                                                       ATTACHMENT 3




      Max Winders & Associates Pty Ltd tas MWA Environmental
Level 15, 241 Adelaide St, Brisbane GPO BOX 3137, Brisbane Qld 4001
      P 07 3002 5500 F 07 3002 5588 E [email protected]
                      W www.mwaenviro.com.au
                        ABN 94 010 833 084

Page 32

 

 

 

3002 TTOZ- 0007

 

(4y/w)) paads pum
ee Te Of 82 of wt Ww iW st “4 St 8 Tt 6 8

 

aus Og UNUeMAL Je 8007 PUE TTOZ-000Z 40} spaads pul jo WesZoIsIH

or

a

v1

or

st

oz

(5%) aequasied

 

 

ol -GoO
02 -OL
oe -07
Or -O08€
oS -OF
09 -0¢
08 -0'9
OOL-08

O01 =<

OHOnEE

i

 

%OL'TT stujed

=

isv4 LS4M

 

HLYON

isva

MeL

HSL

 

%8T'6T SUED

HLNOS,

HLYON

LsamM

 

 

8007
unuemal Wog

 

TLOZ - 0007
unuemal Wog

 

 

Page 33

 

Percentage (%)

30

25

20

15

10

BoM Tewantin
2000 - 2011

Histogram of Wind Speeds for 2000-2011 at Tewantin BoM site

 

 

 

 

 

0 2 4 5 8 9 1 143 15 417 18 21 22 24 26 28 30 31 33 35 37 39
Wind Speed (km/hr)

2003

 

2000

 

2001 2002

 

 

 

2004 2005 2006

 

2007 2008 2009 2010 2011 <= =m All Years

 

 

Percentage (%)

30

25

20

1s

10

Histogram of Wind Directions for 2000-2011 at Tewantin BoM site

 

 

 

 

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360

Wind Direction (°)

 

2000

 

2001 2002

 

2003

 

2004 2005

 

2006

 

2007 2008 2009 2010 2011 <= = All Years

 

 

Page 34

APPENDIX D

Response to Sunshine Coast Regional Council Request for Further
Information from the Ordinary Meeting 14 November, 2013

Prepared by MWA Environmental

Page 35

Ref:    L25913/BH/12-002


26 November 2013


W Donald Milligan Pty Ltd
124 Top Forestry Road
Ridgewood QLD 4563

Attention:      Mr David Milligan


Dear David


Re: Response to Resolution of Sunshine Coast Regional Council Ordinary
    Meeting 14 November 2013–
    Noise, Dust & Odour Issues -
    Proposed Poultry Growing Sheds, Ridgewood

Further to your request, MWA Environmental has reviewed the Sunshine Coast
Regional Council (“SCRC”) Minutes from the Ordinary Meeting of 14 November 2013
(“the Minutes”) in relation to the proposed poultry farm at 124 Top Forestry Road,
Ridgewood.

Council Resolution

The Minutes contain a Council Resolution as follows (relevant extract only):

       That Council defer consideration of application No. MCU12/0184 for a
       Development Permit for Material Change of Use for Animal Husbandry Type 2 –
       Intensive (Poultry Farm) and Environmentally Relevant Activity (ERA 4 - Poultry
       Farming), situated at 136 Top Forestry Rd, Ridgewood to the next Council meeting
       and request the applicant to provide the following additional information:
       …..
       3.    composting and stockpiling methodology including data on management of
             emissions during these processes

MWA Response

Information regarding the operational management of the litter stockpiling,
composting and spreading activities to minimise potential nuisance was provided in
the Preliminary Operational Management Plan – Proposed Poultry Growing Sheds –
124 Top Forestry Road, Ridgewood (MWA Environmental, 11 September 2013).

Further clarification on the management measures is provided in the following
sections.




                          Max Winders & Associates Pty Ltd tas MWA Environmental
                    Level 15, 241 Adelaide St, Brisbane GPO BOX 3137, Brisbane Qld 4001
                          P 07 3002 5500 F 07 3002 5588 E [email protected]
                                          W www.mwaenviro.com.au
                                            ABN 94 010 833 084

Page 36

Mr David Milligan, W Donald Milligan Pty Ltd                                    29 November 2013
Re: Response to Resolution of Sunshine Coast Regional Council Ordinary Meeting 14 November
      2013– Noise, Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                                L25913/BH/12-002



STOCKPILING / COMPOSTING MANAGEMENT

Litter is to be stored within two bunded areas as shown on Callaghan & Toth Plan 01
Rev D Page 9 (September 2013) and are generally described as follows:

        Northern Stockpile Area (adjacent Shed 5)
        Available 300 lineal metres of stockpile within a 120m x 22.5m bunded area
        Available 76 lineal metres of reserve stockpile within a 82m x 14m bunded area

        Southern Stockpile Area (adjacent Shed 3)
        Available 110 lineal metres of stockpile within a 75m x 19m bunded area


Management of the litter stockpiling / composting process is summarised as follows:

    •    Litter will be transferred to the stockpile areas by truck and the initial
         stockpiles formed by tractor, bobcat or backhoe.
    •    The stockpiles will be covered using polyethylene sheet or similar to
         minimise fugitive dust and odour emissions during the storage period.
    •    A compost turning machine (tow-behind tractor)1 will be used to manage
         the composting process and maintain aerobic conditions to minimise odour
         emissions during the stockpiling period. The compost turning machines
         produce linear stockpiles approximately 1.5 metres high by 3 metres wide.
         Available compost turning machines include the ability to pick up and relay
         the covers over the stockpiles.
    •    The litter stockpiles will be turned at least weekly but potentially twice
         per week to maintain aerobic conditions.
    •    Litter turning should only be undertaken when prevailing winds are:
             o   below 10 km/h to minimise fugitive dust and odour emissions; and
             o   from the northeasterly to southeasterly sector to ensure that odour
                 emissions are directed away from sensitive receptors.
    •    In order to minimise the potential cumulative odour impact from the
         stockpiling and spreading of the spent litter, the proponent intends to spread
         all litter within 4 to 5 weeks of the shed clean-out. Under this operational
         regime, odour emissions from the stockpiling and spreading of the spent litter
         occur during the period when only minor emissions are generated from the
         broiler sheds.

The odour modelling undertaken by MWA Environmental, including addressing
matters raised by the technical reviewer engaged by SCRC, indicate that the
cumulative impact of the poultry growing sheds and the litter stockpiling will comply
with the Queensland odour guideline at surrounding residential dwellings.


1
  Examples include ‘JPH Equipment’ (http://ozturners.com.au/icwp/products/compost-turners/) and
‘Seymour Rural Equipment Pty Ltd’ (http://www.seymourrural.com.au/compost-turner-4000.html)


                                               2

Page 37

Mr David Milligan, W Donald Milligan Pty Ltd                                    29 November 2013
Re: Response to Resolution of Sunshine Coast Regional Council Ordinary Meeting 14 November
      2013– Noise, Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                                L25913/BH/12-002



SPREADING MANAGEMENT

Development approvals for poultry farms typically include a condition requiring the
implementation of a Site-Based Environmental Management Plan (SBEMP) prior to
the commencement of use. This Site-Based Environmental Management Plan will
specify management measures to minimise the risk of odour nuisance from the
spreading of litter, such as:

•   Spreading of litter within 4 to 5 weeks of clean-out from the poultry sheds to
    ensure that odour emissions from the spreading of litter do not coincide with peak
    odour emission periods from the next batch of birds in the poultry sheds.
•   Litter from each batch to be spread in a distributed manner across the
    orchard so as to not concentrate odours to a particular boundary of the site. The
    applicant has advised that the available litter from the poultry sheds will not be
    sufficient to spread over all areas of the site in a year i.e. approximately half of
    the trees in the orchard will be covered in a year.
•   Maintaining spreading areas at a minimum setback of 50 metres from the
    southern, eastern and northern property boundaries to minimise potential
    near-field odour influences on adjacent properties. This will provide a minimum
    buffer distance of 300 metres from spreading areas to a residential dwelling.
•   Litter should be spread during the 6am to 6pm period only.
•   Spreading of litter only when prevailing winds are from the northeasterly to
    southeasterly sector as required to minimise odour transport from the spreading
    process.
•   Use of appropriate low velocity spreading equipment2 to minimise release of
    dust (and associated odours) into the atmosphere.
•   Dampening of applied litter during high wind speed periods to minimise
    potential fugitive dust (and odour) emissions.
•   Corrective actions in the event of odour nuisance, including:
        •   Review of spreading locations, methods and practices to identify measure
            to reduce impacts; and
        •   If necessary, export of litter from site if noted to generate excessive odour
            emissions.

With the available 300 metre separation distance from spreading areas to
surrounding residences it is considered that implementation of the above
management measures in accordance with a SBEMP will ensure that the activity
does not cause unreasonable odour nuisance.




2
 Examples include ‘Marshall 800 Series Multispread - Trailed - 2.5T’
(http://www.marshallspreadersales.com.au/800-series-multispread.html) and a Vicon SuperFlow 604’
(http://ien.vicon.eu/Spreading-Equipment/Fertiliser-Spreaders/Rear-Mounted-Pendulum-
Spreaders/Vicon-SuperFlow-604-1654)


                                               3

Page 38

Mr David Milligan, W Donald Milligan Pty Ltd                                    29 November 2013
Re: Response to Resolution of Sunshine Coast Regional Council Ordinary Meeting 14 November
      2013– Noise, Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
                                                                                L25913/BH/12-002




Updated Odour Modelling

In response to further information requested by SCRC Officers by email on 19
November 2013, MWA Environmental has updated the odour emission rate,
meteorological and odour dispersion models to address the modelling preferences of
Council’s technical reviewer. A detailed response is provided in correspondence
Response to Sunshine Coast Regional Further Information Request of 19 November
2013 – Noise, Dust & Odour Issues - Proposed Poultry Growing Sheds, Ridgewood
(L26013/BH/12-002, 29 November 2013).

The results of the updated odour modelling demonstrate that cumulative odour
impacts will comply with the Queensland odour guideline at surrounding residential
dwellings.

The results of the updated odour modelling indicate significantly lesser impacts from
the proposed poultry growing sheds and litter stockpiling as compared the modelling
originally undertaken by MWA Environmental and provided to Council.


Top Forestry Road Dust Modelling


MWA Environmental has reviewed the potential impact of the proposed development
on overall dust emissions from Top Forestry Road considering the average 3.2 truck
trips generated per day at an existing Ingham’s farm at Redland Bay. It is noted that
the Redland Bay farm holds more birds than proposed at the subject site and, as
such, the truck trips are likely to be conservatively high.

For the purposes of this assessment it has been assumed that Top Forestry Road
current carries 200 vehicles per day.

Based upon calculations in accordance with USEPA AP-42 and Environment
Australia techniques, overall particulate emissions from Top Forestry Road are
estimated to increase by less than 10% as a result of the proposed development.
The overall dust emissions resulting from current usage of the public road is
significantly higher than the projected contribution from the proposed development.

On this basis the proposed development would only be expected to have a minor
impact on current on dust levels at residences along Top Forestry Road.

Yours sincerely




Ben Hyde
Environmental Engineer




                                               4

Page 39

APPENDIX E

A Letter Supplied by Qld Farm Manager of Inghams Enterprises P/L
Regarding Poultry Farm Sizes

Page 40

Inghams Enterprises Pty. Limited

20 GO

RETO

 

Monday, November 25, 2013

Dear David and Genevieve
As per our conversation, | would like to confirm the following:

1. Most new Contract Chicken Growing facilities have a 240 000 bird capacity.

2. The viability of farms with less than 200 000 bird capacity Is questionable.

3. Nine Inghams Contract Farms in South East Qid are accessed via unsealed roads.

4. Farms with capacity of greater than 240 000 birds in the vicinity of the Sunshine
Coast are established in the following areas: Elimbah, Donnybrook, Ningi, Wamuran
and Caboolture.

Yours faithfully
wn fe

Brett Richter
Qld Farming Manager

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.