Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2184Response_OM13_222

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

During the 63 day cycle:

On 30 days there are no trips generated.

On 14 days there are 2 trips generated.

On 13 days there are 4 trips generated.

On 1 day there are 6 trips generated.

There are only 5 days out of the 63 in which greater than 6 trips (that is, 3
vehicles) are generated each day

The vehicles used will include:
19m B-double

17m or 18m Semi-trailer
8m or 9m body truck
7m Light truck

Utility

Passenger vehicle

The purpose of the trips will be to:
Deliver shavings

Deliver feed

Deliver chicks

Collect dead birds

Live bird pick up

Carry forklift, foreman & crew
Litter removal

Shed washing

Shed sanitisation

The timing of the trips will vary throughout the day. The live bird pick-up will be
conducted in the early morning. Other deliveries will generally be made during the
hours of 8am to 4pm.

2. Feasibility of requirements to provide to seal to 50m in front of affected
properties on Top Forestry Road or to enter into an infrastructure
agreement with Council.

A Report prepared by MWA Environmental addressing the dust emission of the
vehicles along Top Forestry Road is attached as Appendix D; which concludes that
the additional vehicle movements will increase the overall particulate emissions from
Top Forestry Road by less than 10%; and will only “have a minor impact on dust level
at residences along Top Forestry Road”.

A Plan prepared by Callaghan & Toth showing the extent of Top Forestry Road to be
sealed within 50m of dwellings is attached as Appendix B. The Plans include 5
sections of the road totalling 381.1m located within 50m of dwellings. Please note
that the Plan is conceptual only, subject to further site surveys and subject to
analysis of the individual sites.

With respect to the sealing of Top Forestry Road the applicant proposes that a
Condition of approval be included that states:
Log in to download the original file

2184Response_OM13_222.pdf · 11.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.