Operational Management Plan - 5 Opal St, Cooroy - Crackerjack
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ○ Waste collection contracted to occur between 7:00am–6:00pm only.
○ Contractor briefed on minimising idling noise and avoiding early morning
collections.
● Recycling and Organics:
○ Collected separately to improve diversion from landfill.
○ Data on recycling volumes maintained for environmental reporting.
5.4 Storage and Hygiene
● Designated Storage Area:
○ Enclosed, ventilated, and drained to prevent odour build-up.
○ Located in eastern courtyard, away from patron areas and screened from
neighbours.
● Pest Prevention:
○ Rodent-proof bins with sealed lids provided.
○ Monthly pest control inspections conducted.
● Cleaning:
○ Waste area washed and disinfected weekly.
5.5 Staff Responsibilities
● Induction Training:
○ All staff trained in waste segregation and minimisation.
● Daily Checks:
○ Duty Manager to inspect waste area at end of trade.
● Monthly Audits: