Original source · versioned page text
Operational Management Plan - 5 Opal St, Cooroy - Crackerjack
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnManaging complaints effectively is vital to maintaining strong community relations and
ensuring Council and licence compliance. Crackerjack has established a clear,
transparent system to receive, investigate, and resolve complaints, particularly in
relation to noise and amenity.
6.1 Commitment
● Crackerjack is committed to:
○ Treating all complaints seriously, respectfully, and confidentially.
○ Investigating and resolving complaints promptly.
○ Keeping accurate records of all complaints and actions taken.
6.2 Staff Training
● Induction:
○ All staff trained in complaint handling during induction.
○ Training covers importance of professional communication, active
listening, and de-escalation.
● Ongoing:
○ Refresher training every six months to ensure consistency.
6.3 Lodging a Complaint
● Methods Available:
○ Dedicated phone line to Duty Manager during operational hours.
○ Direct email address for complaints.
○ Onsite verbal complaint to staff.
● Public Display:
○ Contact details for complaints displayed at entry points and on the venue
website.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.