coffey.)geotechnics SPECIALISTS MANAGING THE EARTH
Important information about your Coffey Report
As a client of Coffey you should know that site subsurface conditions cause more construction
problems than any other factor. These notes have been prepared by Coffey to help you
interpret and understand the limitations of your report.
Your report is based on project specific criteria
Your report has been developed on the basis of your earth, rock and time. The actual interface between
unique project specific requirements as understood materials may be far gradual or abrupt than
more
by Coffey and applies only to the site investigated. assumed based on the facts obtained. Nothing can
Project criteria typically include the general nature of be done to change the actual site conditions which
the project; its size and configuration; the location of exist, but steps can be taken to reduce the impact of
any structures on the site; other site improvements; unexpected conditions. For this reason, owners
the presence of underground utilities; and the additional should retain the services of Coffey through the
risk imposed by scope-of-service limitations imposed development stage, to identify variances, conduct
by the client. Your report should not be used if there additional tests if required, and recommend solutions
are any changes to the project without first asking to problems encountered on site.
Coffey to assess how factors that changed subsequent
to the date of the report affect the report’s Your report will only give
recommendations. Coffey cannot accept responsibility
preliminary recommendations
for problems that may occur due to changed factors
Your report is based on the assumption that the
if they are not consulted.
site conditions as revealed through selective
point sampling are indicative of actual conditions
Subsurface conditions can change
throughout an area. This assumption cannot be
Subsurface conditions are created by natural processes substantiated until project implementation has
and the activity of man. For example, water levels commenced and therefore your report recommendations
can vary with time, fill may be placed on a site and can only be regarded as preliminary. Only Coffey,
pollutants may migrate with time. Because a report who prepared the report, is fully familiar with the
is based on conditions which existed at the time of background information needed to assess whether
subsurface exploration, decisions should not be based or not the report’s recommendations are valid and
on a report whose adequacy may have been affected whether or not changes should be considered as
by time. Consult Coffey to be advised how time may the project develops. If another party undertakes
have impacted on the project. the implementation of the recommendations of this
report there is a risk that the report will be misinterpreted
Interpretation of factual data and Coffey cannot be held responsible for such
misinterpretation.
Site assessment identifies actual subsurface conditions
only at those points where samples are taken and
Your report is prepared for
when they are taken. Data derived from literature
and external data source review, sampling and specific purposes and persons
subsequent laboratory testing are interpreted by To avoid misuse of the information contained in your
geologists, engineers or scientists to provide an report it is recommended that you confer with Coffey
opinion about overall site conditions, their likely before passing your report on to another party who
impact on the proposed development and recommended may not be familiar with the background and the
actions. Actual conditions may differ from those inferred purpose of the report. Your report should not be
to exist, because professional, no
no matter how applied to any project other than that
originally
qualified, can reveal what is hidden by specified at the time the report was issued.
Coffey Geotechnics Pty Ltd ABN 93 056 929 483
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.