Callaghan & Toth
6.2 Impact to Local Waterways
Blackfellow Creek forms the northern boundary of the site and flows to the Mary River. This
creek is a Lowland Freshwater waterway under the Environmental Protection (Water)Policy
2009 -
Mary River environmental values and water quality objectives Basin No. 138
-
including all tributaries of the Mary River (July 2010). The EPP Water details the water
quality objectives for this waterway type, including:
. Total Nitrogen < 0.5 mg/L
. Total Phosphorus < 0.05mg/L
. Suspended Solids < 6mg/L
Management of the farm will include the following to ensure water quality of Blackfellow
Creek is not impacted by this use:
. Stormwater runoff will be treated as per Section 3,
. Chicken litter will be used to fertilise avocado trees so there is no increase of nutrient
application to the land.
. Commercial fertiliser usage will cease.
. Excess chicken litter will be sold off-site.
. Farm management will conduct soil and leaf analysis to ensure chicken litter is
supplying adequate ratios of nutrients and minerals.
. The application of chicken litter will be managed to minimise the potential of the
contamination of local waterways and will not be applied:
o within 50 m of waterways allowing overland flow to reduce run-off volume and
re-capture particulate contaminants in run-off
o during heavy rainfall periods to minimise contaminants in run-off
o on windy days to minimise inappropriate dispersal
o on weekends to mini mise the risk of dust or odours annoying neighbours.
. Vegetated buffers to Blackfellow Creek will be maintained on site.
. Runoff from the majority of the avocado orchard (38 hectares) will continue to be
directed to onsite dams.
23
1209 Animal Husbandry Top Forestry Rd, Ridgewood
-
SWQMP
April 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.