Response to Information Request - MCU12/0184
The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 46, section 1. The text section number identifies this passage in the reader.
~
Callaghan & Toth
on Map SBC, on-site detention measures are
contained within the developed areas of the site, clear
of drainage lines and Open Space Precincts.
Run-off treatment S6.1
06 Run-off that leaves the site is treated so as not to
adversely impact on the ecology and hydrology of 56.1 & 57.1 Development complies with the water
downstream environmental flows; quality standards in Table 2 of the SEQ Regional Plan
AND Implementation Guideline NO.7 for Water Sensitive S7.1 N/A
Urban Design.
07Within the Shire Business Centre site, as shown
on MapSBC-
a) run-off treatment occurs within the site; and
b) drainage lines are only used for final polishing of
run-off.
Town water supply connections 58.1 A suitable backflow prevention device is S8.1 N/A
08 Backflow devices or similar systems ensure water installed to protect the potable water within the
reuse facilities have no impact on the quality of the reticulated water supply in accordance with AS/NZS
town mains water. 3500:2003 Plumbing and Drainage.
Use of natural treatments and systems
09 Natural treatment strategies, including grass S9.1 Proposed stormwater treatment for the works include
swales and bio-retention systems, vegetated filtration 59.1 & 510.1 Development complies with the water bioretention basins, bioretention swales, grassed swales,
quality standards in Table 2 of the SEQ Regional Plan grassed buffers and rainwater tanks.
strips and gross pollutant traps, are used wherever
practicable; Implementation Guideline NO.7 for Water Sensitive
AND Urban Design.
S10.1 N/A
010 Within the Shire Business Centre, as shown on
Map SBC-where necessary, drainage lines are
ecologically enhanced to ensure that the water quality
polishing functions are of hiQh standard.
A
1209 Animal Husbandry Top Forestry Rd, Ridgewood
-
SWQMP
April 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.