Callaghan & Toth
Corrective Actions The Consultant will redesign the Rainwater Tank system to address any
concerns.
Major changes will require further Stormwater Quality Management Modelling.
Construction Phase
Objective The Contractor will install the Rainwater Tank system to ensure non potable
supply.
Actions Builder to install tanks as part of construction and connect to the roof or
stormwater drainage system when the building and access roads / carparks
are complete.
. Builder to install tanks in accordance with manufacturer’s
specifications.
. Plumber to connect tank in accordance with applicable
Plumbing/Building Codes.
. Plumber to connect tank overflow to the Bioretention system or to a
location that that will not cause excessive erosion.
Monitoring Council to review Plumbing application for tank installation from a certified
plumber.
Builder to review Plumbing application to ensure with requirements of this
IWMP.
Builder to assess that rainwater / stormwater tank systems are correctly
installed as per requirements.
Reporting Plumbing approval to be logged and kept for verification of compliance on a
need basis
Incidents Approval is not granted for plumbing application.
Rainwater /Stormwater tanks are not installed correctly.
Overflows are not installed correctly.
Float switch alarm is not installed correctly.
Corrective Action Builder / plumber to review application and change to address issues raised.
Builder / plumber to re-install parts of rainwater / stormwater tank system that
are faulty and ensure they are installed as per manufacturer’s specifications
and requirements of this IWMP.
Operational Phase
Objective Ensure that rainwater / stormwater dam system is operating effectively and
providing non-potable water supply to the centre.
Ensure that rainwater / stormwater dam system is not providing a breeding
habitat for mosquitos.
Actions Owner to maintain rainwater / stormwater dam systems as follows and conduct
B
1209 Animal Husbandry Top Forestry Rd, Ridgewood
-
SWQMP
April 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.