Response to Information Request - MCU12/0184

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 52, section 1. The text section number identifies this passage in the reader.

                                                                                                ~
                                                                                             Callaghan & Toth


Corrective Actions          The Consultant will redesign the Rainwater Tank system to address any
                            concerns.


                            Major changes will require further Stormwater Quality Management Modelling.

                                              Construction Phase


Objective                   The Contractor will install the Rainwater Tank system to ensure non potable
                            supply.



Actions                     Builder to install tanks as part of construction and connect to the roof or
                            stormwater drainage system when the building and access roads / carparks
                            are   complete.
                                  .   Builder to install tanks in accordance with manufacturer’s
                                      specifications.
                                  .   Plumber to connect tank in accordance with applicable
                                      Plumbing/Building Codes.
                                  .   Plumber to connect tank overflow to the Bioretention system or to a
                                      location that that will not cause excessive erosion.




Monitoring                  Council to review Plumbing application for tank installation from a certified
                            plumber.
                            Builder to review Plumbing application to ensure with requirements of this
                            IWMP.

                            Builder to assess that rainwater / stormwater tank systems are correctly
                            installed as per requirements.


Reporting                   Plumbing approval to be logged and kept for verification of compliance on a
                            need basis


Incidents                   Approval is not granted for plumbing application.
                            Rainwater /Stormwater tanks are not installed correctly.

                            Overflows are not installed correctly.

                            Float switch alarm is not installed correctly.


Corrective Action           Builder / plumber to review application and change to address issues raised.

                            Builder / plumber to re-install parts of rainwater / stormwater tank system that
                            are   faulty and ensure they are installed as per manufacturer’s specifications
                            and requirements of this IWMP.


                                                Operational Phase

Objective                   Ensure that rainwater / stormwater dam system is operating effectively and
                            providing non-potable water supply to the centre.
                            Ensure that rainwater / stormwater dam system is not providing a breeding
                            habitat for mosquitos.


Actions                     Owner to maintain rainwater / stormwater dam systems as follows and conduct



                                                                                                               B

1209 Animal Husbandry   Top Forestry Rd, Ridgewood
                        -
                                                                                                SWQMP
April 2013
Log in to download the original file

Response to Information Request - MCU12_0184.pdf · 122 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.