_Jj
Callaghan & Toth
six monthly inspections:
. Check gutters for leaf litter
. Check stainless steel mesh guards are in place
. Check first flush system is functioning
. Check overflow is not causing any scour
. Check float switch is functioning
Owner to also conduct periodic assessments (approx. 5 to 10 years) to
determine whether sediments deposits require removal from within the tank.
Monitoring Owner to monitor rainwater tank systems as detailed above.
Reporting Records are to be logged and kept for verification of compliance on a need
basis.
Incidents . Rainwater tanks has been removed or disconnected
. Rainwater tank system is faulty e.g. roof, guttering, first flush system or
tank is damaged.
. Overflow has been disconnected from absorption trench
. Overflow is causing scour.
. Rainwater tank capacity is insufficient for demand.
Corrective Action Owner will be required to :
. Reinstall or connect rainwater tank
. Maintain rainwater tank system
. Reconnect overflow to absorption pit (if exist on lot)
. Stabilise overflow discharge area or move to more appropriate
location.
Owner to investigate providing extra roof area for rainwater collection to allow
installation of extra rainwater tanks.
Owner to investigate treating excess stormwater from access roads and
carparks to potable water quality to meet demands.
VEGETATED BUFFER
ISSUES PROCEDURES
Design Phase
Objective Ensure that vegetated buffers are maintained with vegetated cover and
overland f10wpaths are maintained as sheet flow.
Actions The Consulting Engineer is to ensure that:
. Buffers are sized in accordance with this Integrated Water
B
1209 Animal Husbandry Top Forestry Rd, Ridgewood
-
SWQMP
April 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.