Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Response to Information Request - MCU12/0184

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (122 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 54, section 1. The text section number identifies this passage in the reader.

                                                                                               ~
                                                                                            Callaghan & Toth

                                       Management Plan.
                                  .    Buffers drain evenly and do not concentrate flows.



Monitoring                    Developer is to review the Works Plans and Building Plans.

Reporting                    Works Plans and Building Plans are to be provided to consultants, developer
                             and contractor.


Incidents                    The Buffers are not approved according to submitted plans.


Corrective Actions           The Consultant will redesign the Buffer system to address any concerns.

                             Major changes will require further Stormwater Quality Management Modelling.

                                                Construction Phase


Objective                    The Contractor will install the Buffers to ensure overland flow is evenly
                             distri buted.


Actions                      Contractor to construct buffers as per the plans and ensure:

                                  .    Buffers are well vegetated with no bare earth.


Monitoring                   Design Engineer to review buffer construction to ensure in accordance with
                             design plans.


Reporting                    Operational Works approval to be logged and kept for verification of
                             compliance on a need basis

Incidents                    Approval is not granted for Operational Works application.
                             Buffers not adequately stabilised with vegetated cover.


Corrective Action            Contractor to review application and change to address issues raised.

                             Contractor to grass-seed or turf buffer to achieve required vegetation cover.


                                                  Operational Phase

Objective                    Ensure that vegetated buffer system is operating effectively and providing
                             treatment of overland sheet flow from catchments around chicken farm.


Actions                      Owner to maintain vegetated buffers as follows and conduct six monthly
                             inspections:
                                  .    Check for areas of erosion

                                  .    Check for areas of concentrated flow

                                  .    Check for vegetation cover over buffer area


Monitoring                   Owner to monitor vegetated buffer systems as detailed above.




Reporting                    Records are to be logged and kept for verification of compliance on a need
                             basis.




                                                                                                             B

1209 Animal Husbandry   -
                            Top Forestry Rd, Ridgewood                                         SWQMP
April 2013
Log in to download the original file

Response to Information Request - MCU12_0184.pdf · 122 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.