Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2016-08-09 Services & Organisation Committee Agenda

of 148

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                              9 AUGUST 2016


2.     Electrical Infrastructure

Following Energex investigations it is considered that there is limited risk from the public utility
aspect of electrical infrastructure. However, as the pad mount transformer and charging units are
yet to be fully designed there remains some risk of unforeseen costs. At this stage unforeseen
costs are allowed for in the $40,000 contingency amount.

Council is also seeking that relevant Australian Standard testing be applied to the Higer / AOWEI
charging infrastructure prior to it leaving China to ensure that it is able to operate within the same
parameters required by Energex’s network to reduce compatibility risks.

Finance

Table 1: Electric Bus Trial Budget

Organisation                     Original Trial Budget               Expenses to date      Remaining Budget
TransLink                        $480,000                            $15,277               $464,723
Noosa Council                    $550,000                            $41,470               $508,530
Total                            $1,030,000                          $56,747               $973,253

The remaining budget for the electric bus trial is $973,253 with a maximum of $508,530 from
Noosa Council and $464,723 from TransLink.

Table 2: Proposed Lease and Non-Lease Costs

Item                                                            Lease Cost
Six month lease cost                                            $131,200
Noosa Council contribution                                      $65,600
TransLink contribution                                          $65,600


Item                                                            Non Lease Costs (to be confirmed)
Consultancy fees – evaluation, legal, electrical                $120,000
Electricity costs                                               $13,000
Gantry cover                                                    $12,000
Livery (external & internal)                                    $20,000
Ticketing equipment                                             $6,000
Sunbus cost model                                               $378,790
Overnight garaging of bus                                       $0 - Currently deemed as being stored at
                                                                Council Bartlett Street Depot at nil cost.
Bus Maintenance                                                 $0 - Currently deemed included as part of
                                                                Sunbus Operating expenses.
Cleaning                                                        $5,000
Marketing                                                       $20,000
Contingency                                                     $40,000
Total estimated non-lease costs                                 $614,790
Noosa Council contribution                                      $307,395
TransLink contribution                                          $307,395
(Reductions in the marketing and contingency items have been made)




                                                                                              Page 137 of 148
Log in to download the original file

2016-08-09 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.