Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2016-08-09 Services & Organisation Committee Agenda

of 148

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                            9 AUGUST 2016


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                          THE NEXT QUARTER
Delivery of 2015/16 Renewal                  Gravel road re-sheeting programme          Planning for 2016/17 gravel re-                Delivery of 2016/17 Renewal
Programmes including: Gravel Road              completed                                    sheeting programme                               Programmes
Re-sheeting, Road surfacing &                Road surfacing and stormwater pit          Planning of road surfacing &
Rehabilitation, Stormwater Pit                 replacement programmes                       rehabilitation and stormwater pit
Replacement                                    completed.                                   replacement programme for
                                                                                            2016/17.
Review vegetation management                 Tender documents finalised & out to        Evaluate tenders & report to Council      New contracts in place
arrangements                                   market for renewal of mowing                 following close of tenders
                                               contracts including separable portion
                                               for rural roads
Business as Usual activities                 Construction works & resurfacing of        Finalise returns to the Queensland        Blasting Ringtail Quarry
                                               the latest stage of Cooroy-Noosa             Reconstruction Authority for NDRRA        Carry out major bridge repairs
                                               Road                                         funding for Cooroy-Belli Ck Road
                                                                                            project                                   Replanting garden beds
                                             Completion of Cooroy-Belli Ck Road
                                               slip repair.                               Preparation for auction of surplus        Installation of Wallace Park sprinkler
                                                                                            items at Ringtail Quarry                    system
                                             Replaced deteriorated decking
                                               planks on Noosa Main Beach                 Establishment of a landscaping
                                               boardwalk                                    services panel of providers.
                                             Evaluation of Tenders for Plant Hire       Mulching Programme
                                               Panel of Providers

Infrastructure Planning & Design

Development of the Noosa Transport           Consultant’s working papers for 20         Review consultants work and               Finalise 5 year action plan.
Strategy in conjunction with Strategic         year mission and 10 year strategy            awaiting recommendations on action        Prepare summary report
Planning                                       received.                                    plan
                                                                                                                                      Workshop with council
                                             Second round of community &
                                               stakeholder consultation completed                                                     Community engagement on final
                                                                                                                                        report
                                                                                                                                      Report to Council
Implement recommendations of the             Traffic Study completed and                Design of Ernest St and Hilton Tc         Design of Ernest St and Hilton Tc
Traffic Study and monitor outcomes with        reported to Council in February              intersection improvements                   intersection improvements
audits with aim to improve safety              2016.
standards




                                                                                             Page 142 of 148
Log in to download the original file

2016-08-09 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.