SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           9 AUGUST 2016


BRANCH ACTIVITIES                         RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                            THE NEXT QUARTER
Upgrade of bus stops including shelters      Five contracts complete                   Finalisation of 2015/16 Passenger           Commence planning for 2016/17
to meet disability access standards.         Installation of 19 bus shelters             Transport Accessibility Infrastructure        PTAIP.
                                               complete                                    Programme (PTAIP)
                                             All bus stop upgrades (37) complete       2016/17 PTAIP submitted to
                                                                                           TransLInk
Refurbishment of Munna Point Bridge          Completion of the project is              Completion of bridge deck work              Ongoing monitoring of cathodic
                                               scheduled for May 2016                                                                    protection system continues.
Public Transport – electric bus trial        Negotiating with preferred tenderer.      Energex design and approvals for            Monitoring of program to ensure
                                                                                           charging infrastructure.                      delivery Jan/Feb 2017.
                                                                                         Finalisation of contract with
                                                                                           preferred tenderer.
Construction of Dr Pages Road and            Project completed May 2016.               Monitoring of 12 month defect               Monitoring of 12 month defect
Kinmond Creek Road                                                                         liability period.                             liability period.

Business as Usual activities                 Hydrological & hydraulic modelling        Coastal directional signage review.         Commence planning and design for
                                               for Sandy Creek and Eastern Branch        Hilton Terrace intersection and               2016/2017 capital works program.
                                               Creek culvert upgrades on Kinmond           corridor upgrade design.                    Cooroy Noosa Road Stage 3, 2 and
                                               Creek Road                                                                                1 design.
                                                                                         Station Street, Pomona Bus
                                             Poinciana Avenue footpath upgrade           Turnaround design.                          Rural Directional Signage review.
                                               design.
                                                                                         James Street, Cooran footpath               Noosa Parade Corridor upgrade
                                             Ben Lexcen Drive, Sunrise Beach             upgrade design.                               consultation.
                                               corridor upgrade design.
                                                                                         Rufous Street, Peregian
                                                                                           development civil works design.
                                                                                         Black Mountain Road, Black
                                                                                           Mountain slip design.
                                                                                         Thomas Street, Noosaville
                                                                                           stormwater upgrade design.
                                                                                         Noosaville Foreshore furniture
                                                                                           redesign.
                                                                                         Detailed design of Sandy Creek and
                                                                                           Eastern Brach Creek culvert
                                                                                           upgrades.
                                                                                         Cooroy Noosa Road, Tewantin
                                                                                           Stage 4 design.

                                                                                            Page 143 of 148
Log in to download the original file

2016-08-09 Services & Organisation Committee Agenda(PDF, 7MB).pdf · 7.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.