SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 9 AUGUST 2016
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Upgrade of bus stops including shelters Five contracts complete Finalisation of 2015/16 Passenger Commence planning for 2016/17
to meet disability access standards. Installation of 19 bus shelters Transport Accessibility Infrastructure PTAIP.
complete Programme (PTAIP)
All bus stop upgrades (37) complete 2016/17 PTAIP submitted to
TransLInk
Refurbishment of Munna Point Bridge Completion of the project is Completion of bridge deck work Ongoing monitoring of cathodic
scheduled for May 2016 protection system continues.
Public Transport – electric bus trial Negotiating with preferred tenderer. Energex design and approvals for Monitoring of program to ensure
charging infrastructure. delivery Jan/Feb 2017.
Finalisation of contract with
preferred tenderer.
Construction of Dr Pages Road and Project completed May 2016. Monitoring of 12 month defect Monitoring of 12 month defect
Kinmond Creek Road liability period. liability period.
Business as Usual activities Hydrological & hydraulic modelling Coastal directional signage review. Commence planning and design for
for Sandy Creek and Eastern Branch Hilton Terrace intersection and 2016/2017 capital works program.
Creek culvert upgrades on Kinmond corridor upgrade design. Cooroy Noosa Road Stage 3, 2 and
Creek Road 1 design.
Station Street, Pomona Bus
Poinciana Avenue footpath upgrade Turnaround design. Rural Directional Signage review.
design.
James Street, Cooran footpath Noosa Parade Corridor upgrade
Ben Lexcen Drive, Sunrise Beach upgrade design. consultation.
corridor upgrade design.
Rufous Street, Peregian
development civil works design.
Black Mountain Road, Black
Mountain slip design.
Thomas Street, Noosaville
stormwater upgrade design.
Noosaville Foreshore furniture
redesign.
Detailed design of Sandy Creek and
Eastern Brach Creek culvert
upgrades.
Cooroy Noosa Road, Tewantin
Stage 4 design.
Page 143 of 148
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.