Our ref: 241207.01
Council Ref: OPW26/0012


24 March 2026

The Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565

Attention:           Development Assessment – Felix Gough
Via Email:           [email protected]

Dear Felix,

Re:       Response to Council’s Information Request
          Development Permit for Operational Works for Excavation and filling for the purpose of a dam(s)
          64 Main Street, Kin Kin
          Lot 2 on SP226603
          Council ref: OPW26/0012

I refer to Council’s Information Request, dated 16 February 2026 in relation to the abovementioned
development.

On behalf of the applicant, Trillium Apperceived Pty Ltd, and in accordance with Section 13 of the DA Rules, we
provide a response to all the issues raised. A response to the item(s) raised in Councils Information Request is
outlined below:

ITEMS 1 & 2 – GEOTECHNICAL CONSIDERATIONS
Provide a site-specific geotechnical assessment prepared by a registered professional engineer (RPEQ)
demonstrating compliance with the PO3, PO12(c) of the Earthworks Code and PO1 of the Landslide Hazard
Overlay Code. The assessment must certify that:
a) the stability of the site, including associated buildings and infrastructure, will be maintained and
    operational for the life of the development;
b) the site is not subject to the risk of landslide activity originating from other land, including land above the
    site; and
c) development of the site will not increase the risk of landslide activity on other land.

Alternatively, provide a statement by a suitably qualified person (RPEQ) confirming that the proposed works do
not create a risk of landslide in the long term.

RESPONSE
Please refer to the Slope Stability Assessment prepared by Tectonic (Attachment 1), which addresses the above.




                                                                                                          Page 1 of 2
Our ref: 241207.01
Log in to download the original file

ASTP-Rspns_To_RFI.pdf · 450 KB (small file)

Full text of the other 1 page

Page 2

ITEM 3 – OVERLAND FLOW:
Provide drainage calculations demonstrating the drainage system and open channels are appropriately designed
to cater for the 1%AEP event at year 2100.


ITEM 4 – EROSION AND SEDIMENT CONTROLS
Provide an Erosion and Sediment Control plan to address Performance Outcome 14 of the Water Quality and
Drainage Code. The plan must be prepared by a suitably qualified person (RPEQ / CPESC) and be designed in
accordance with IECA’s Best Practice.


RESPONSE
Please see attached revised engineering plans prepared by BAX engineering (Attachment 2) which addresses
the drainage channel design calculations (item 3) and sediment and erosion controls (item 4).



This represents our complete response to the Information Request issued by Council, and we look forward to
the Decision Notice being issued in accordance with the relevant provisions of the Planning Act 2016.

As always, please feel free to contact me direct should you require any additional information or clarification.

Yours faithfully,


ADAMS + SPARKES
TO WN P L ANN ING




Cameron Adams
MANAGING DIRECTOR

Encl:       Slope Stability Assessment prepared by Tectonic (Attachment 1)
            Revised Engineering plans prepared by BAX engineering (Attachment 2)




                                                                                                        Page 2 of 2
Our ref: 241207.01

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.