Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

ASTP-Rspns_To_RFI

of 2

Page text shows just the words. Original shows the document exactly as it was published.

ITEM 3 – OVERLAND FLOW:
Provide drainage calculations demonstrating the drainage system and open channels are appropriately designed
to cater for the 1%AEP event at year 2100.


ITEM 4 – EROSION AND SEDIMENT CONTROLS
Provide an Erosion and Sediment Control plan to address Performance Outcome 14 of the Water Quality and
Drainage Code. The plan must be prepared by a suitably qualified person (RPEQ / CPESC) and be designed in
accordance with IECA’s Best Practice.


RESPONSE
Please see attached revised engineering plans prepared by BAX engineering (Attachment 2) which addresses
the drainage channel design calculations (item 3) and sediment and erosion controls (item 4).



This represents our complete response to the Information Request issued by Council, and we look forward to
the Decision Notice being issued in accordance with the relevant provisions of the Planning Act 2016.

As always, please feel free to contact me direct should you require any additional information or clarification.

Yours faithfully,


ADAMS + SPARKES
TO WN P L ANN ING




Cameron Adams
MANAGING DIRECTOR

Encl:       Slope Stability Assessment prepared by Tectonic (Attachment 1)
            Revised Engineering plans prepared by BAX engineering (Attachment 2)




                                                                                                        Page 2 of 2
Our ref: 241207.01
Log in to download the original file

ASTP-Rspns_To_RFI.pdf · 450 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.