Decision Notice - Minor Change - 51992 517 01 [As Published] · 51992.517.01
Officer: Samuel Osakwe
Direct Telephone: 07 5329 6316
Our Reference: 51992.517.01
Your Reference: 20230736
19 December 2023
Mr TP Mardling
C/- Adapt Development Management P/L
PO Box 7618
SIPPY DOWNS QLD 4556
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 10 August 2023, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: 51992.517.01
Street address: Maison Bleu 2/17 Ferris Street, Sunshine Beach
Real property description: Lot 2 BUP 12790
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 19 October 1992.
• Town Planning Consent Permit – Duplex.
In relation to the request to make a minor change to the existing approval, Council on 12 December
2023, decided to approve the requested changes. The changes are detailed below.
A. Approve the change; and
B. Amend condition 1.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans in accordance with Condition 1 of the original approval (51992.517) and
additionally the below list of approved plans and may be amended by conditions of this
approval and/or annotations on the plans.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Plan No. Rev. Plan/Document Name Date
SD.01 E Site Plan, prepared by Garland Design 21/11/2023
SD.02 E Ground Floor Plan, prepared by Garland Design 21/11/2023
SD.05 E Elevations, prepared by Garland Design 21/11/2023
SD.06 E Elevations, prepared by Garland Design 21/11/2023
2. Provision of at least 3off-street car parking spaces, comprising 2 covered spaces and 1
uncovered spaces, and access thereto which are to be provided with a sealed pavement and
designed, drained, constructed and maintained in accordance with the Planning Scheme,
Council’s Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
specifications for these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be granted until the
Shire Engineer has approved of the carparking and access scheme.
3. Payment to Council of $100 in accordance with Council’s Policy on Beach Access
Contributions, prior to the issue of Building Approval.
4. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
5. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscaping plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.
6. Any fencing provided in conjunction with the development is to be setback and average of
two (2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the
Planning Scheme.
7. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use.
8. Construction work and other associated activities are permitted only during the hours of 7.00
a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
extended hours are approved by the Building Surveyor.
9. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks, current at the time of Building Approval. An estimate of the charges as at June
1992 under the current policy is as follows:-
Water Supply - $1474
Sewerage - $ 762
TOTAL: $2236
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendments is made to Council’s policy.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged, prior to the release of the
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval.
Page 2 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
Page 3
10. The footpath across the frontage of the site is to be upgraded by the provision of a 1.2 metres
wide concrete footpath and the forming, grassing and topsoiling of the remaining area to the
satisfaction of the Shire Engineer. The footpath is to be generally located 0.9 metres from
the property alignment, though a curvilinear alignment may also be acceptable and desirable.
11. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external to the
site.
12. Connection to Council’s existing sewerage reticulation systems at the developer’s expense
to the standards and requirements of the Shire Engineer.
13. The developer shall provide a metered water connection from the water supply system to the
proposed development, in accordance with Council’s standards and to the satisfaction of the
Shire Engineer.
14. Stormwater is to be disposed of on site so as to cause no scour or damage to adjoining
properties to the satisfaction of the Shire Engineer. A Building Approval shall not be granted
until the Shire Engineer has approved the drainage scheme.
15. Provisions of an imperviously paved and drained area to be accommodate all refuse
containers to the reasonable satisfaction of Council’s Environmental Health Officer. This area
is to be aesthetically screened from any road frontage or adjoining property boundary and is
to be setback a distance of two (2) metre from any road frontage. A suitable hosecock and
hoses are to be located in the vicinity of the refuse container area.
16. Submission of a cash bond or trading bank guarantee to the sum of $2000 to secure
performance of conditions, prior to the issue of Building Approval. The cash bond or trading
bank guarantee will be returned upon performance of the conditions of approval.
17. Any flat or unit intended to be let out for fee or reward is to be licensed annually with Council’s
Health Department in accordance with the provisions of Chapter 43 of Council’s By-Laws
prior to such letting.
18. The provisions of this approval are to be effected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval for the purposes of litigation should the use not be conducted in
accordance with this approval.
19. The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of the Local
Government (Planning and Environment) Act if commencement of erection or works have
not been made in accordance with that Permit or the rights conferred by the Permit are not
exercised within two (2) years of the date of issue to the Permit.
20. The Town Planning Consent Permit lapses where:-
a. The use or erection of a building or other structure associated with the use, has not
been commenced within four (4) years of the date is issue of the Town Planning
Consent Permit, unless application is made and approved by Council for an extension;
or
b. The use of any premises pursuant to the Town Planning Consent Permit ceases for a
period of twelve (12) months.
5. REFERRAL AGENCIES
Not applicable.
Page 3 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
Page 4
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building works.
10. SUBMISSIONS
Not required.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Samuel Osakwe
Development Planner
Enc: Appeal Rights
Approved Plans/Documents
cc. Unitywater
DECISION NOTICE HISTORY
• Original Decision Notice – 19 October 1992.
• Decision Notice – Minor – 51992.517.01 – 12 December 2023, with an amendment to condition 1.
Page 4 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
Page 5
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 5 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
Used in these records
Decision Notice - Minor Change - 51992 517 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 166 KB (small file)
- File type
No other editions are linked here.