Decision Notice - Minor Change - 51992 517 01 [As Published] · 51992.517.01

of 5

Text shows just the words. Original shows the document exactly as it was published.

                        Plan No.       Rev. Plan/Document Name                                    Date

                        SD.01          E      Site Plan, prepared by Garland Design               21/11/2023

                        SD.02          E      Ground Floor Plan, prepared by Garland Design 21/11/2023

                        SD.05          E      Elevations, prepared by Garland Design              21/11/2023

                        SD.06          E      Elevations, prepared by Garland Design              21/11/2023

               2.     Provision of at least 3off-street car parking spaces, comprising 2 covered spaces and 1
                      uncovered spaces, and access thereto which are to be provided with a sealed pavement and
                      designed, drained, constructed and maintained in accordance with the Planning Scheme,
                      Council’s Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
                      specifications for these works are to be submitted to the Shire Engineer for approval in
                      conjunction with the Building Application. A Building Approval shall not be granted until the
                      Shire Engineer has approved of the carparking and access scheme.
               3.     Payment to Council of $100 in accordance with Council’s Policy on Beach Access
                      Contributions, prior to the issue of Building Approval.
               4.     There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
                      creation of excessive noise, lighting nuisance or other emissions.
               5.     The open space and setback areas are to be landscaped in accordance with Council’s Policy
                      on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
                      approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
                      is to be completed in accordance with the approved landscaping plan, prior to the premises
                      being occupied and maintained at all times thereafter to the reasonable satisfaction of the
                      Shire Planner.
               6.     Any fencing provided in conjunction with the development is to be setback and average of
                      two (2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the
                      Planning Scheme.
               7.     Existing trees on the site and within road reserves are to be retained, except where required
                      to be removed due to building operations or the conduct of the approved use.
               8.     Construction work and other associated activities are permitted only during the hours of 7.00
                      a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
                      extended hours are approved by the Building Surveyor.
               9.     Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
                      Headworks, current at the time of Building Approval. An estimate of the charges as at June
                      1992 under the current policy is as follows:-
                      Water Supply     - $1474
                      Sewerage         - $ 762
                      TOTAL:               $2236
                      Please note that the headworks charges will alter in accordance with Price Index variations
                      or if any amendments is made to Council’s policy.
                      If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
                      or trading bank guarantee for the required amount is to be lodged, prior to the release of the
                      Approval. The contribution is then required to be made within fourteen (14) days of the issue
                      of Building Approval.




                                                                                                       Page 2 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023

Used in these records

About this file

File size
166 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - 51992 517 01 [As Published].pdf · 166 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.