Decision Notice - Minor Change - 51992 517 01 [As Published] · 51992.517.01
Plan No. Rev. Plan/Document Name Date
SD.01 E Site Plan, prepared by Garland Design 21/11/2023
SD.02 E Ground Floor Plan, prepared by Garland Design 21/11/2023
SD.05 E Elevations, prepared by Garland Design 21/11/2023
SD.06 E Elevations, prepared by Garland Design 21/11/2023
2. Provision of at least 3off-street car parking spaces, comprising 2 covered spaces and 1
uncovered spaces, and access thereto which are to be provided with a sealed pavement and
designed, drained, constructed and maintained in accordance with the Planning Scheme,
Council’s Policies and to the reasonable satisfaction of the Shire Engineer. Plans and
specifications for these works are to be submitted to the Shire Engineer for approval in
conjunction with the Building Application. A Building Approval shall not be granted until the
Shire Engineer has approved of the carparking and access scheme.
3. Payment to Council of $100 in accordance with Council’s Policy on Beach Access
Contributions, prior to the issue of Building Approval.
4. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
5. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscaping plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.
6. Any fencing provided in conjunction with the development is to be setback and average of
two (2) metres to any road frontage pursuant to clause 36 (6) (c) of the Schedule to the
Planning Scheme.
7. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use.
8. Construction work and other associated activities are permitted only during the hours of 7.00
a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where
extended hours are approved by the Building Surveyor.
9. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks, current at the time of Building Approval. An estimate of the charges as at June
1992 under the current policy is as follows:-
Water Supply - $1474
Sewerage - $ 762
TOTAL: $2236
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendments is made to Council’s policy.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged, prior to the release of the
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval.
Page 2 of 5
Document Set ID: 22736126
Version: 4, Version Date: 19/12/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Minor Change - 51992 517 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 166 KB (small file)
- File type
No other editions are linked here.