Council archive · source document
Appendix A - Proposal Plans · MCU17/0004
Attached to the e-mail REC17/0002, MCU17/0004 & OPW17/0005 Boundary Realignment, Material Change of Use (2 x duplexes) & Op Works - 46-48 Elizabeth St, Noosaville.
Plans and drawings: the text below has words only, no drawings.
ELIZABETH STREET
BM: NAIL IN KERB
RL: 1.600
43
1. 47
57
1. .40
1. .35
57
5
58 4
61
1.
51 1.5
1. 1.4
48
54
1.
1.
1.
PP
1
1
PP
59
1.
1.
55
54
56
50
54
1.
1.
1.
1.
1.
40
55
WM
1.
1.
WM
66
54
1.
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10 2
74
2 STOREY
1.
BRICK UNITS
35.46
GTP395
3
59
67
1.
1.
6.09 7 2
66
1.
77
742m²
1.
1.
SHED
2
35.46
630m²
SINGLE STOREY GTP156216
5
68
1.
TIMBER & FIBRO
18.36
DECK
IO
MH
LL: 1.53 CP
49
1.
IL: 0.52
50
47
65
1.
1.
1.
14.83 20.92
60
1.
SINGLE STOREY4 RP72986
2 STOREY
BLOCK & H'PLANK
6 GTP671
DECK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
N Level Origin PM 56277, RL 1.635m
www. dialbeforeyoudig.com.au
SAY DIAL 1100
¥y BEFORE YOU DIG
80-120mm AGGREGATE
(NO FINES) HARD STAND
OVERLAY FOR DELIVERY’S
DURING CONSTRUCTION.
CREATE BUNDING IN TEMPORARY
HARDSTAND FOR DIVERISION INTO
SILT FENCES.
BM: NAIL IN KERB
S © 6 A\o, «KERB be RL: 1.600 “A
SSS Ye Ne €
NEP E E Q- E e LR E Px E
© 2 a 2 & ‘2 &
~ Ww Ww W W Ww <—w vm Ww Ww
RP. BOU
_ oa _ _ _ v _ _ _ _ _ _ _ _ _ _ _ a
(ee prs — = —8tb0. 92 — at as
i Ll = COMM(
‘| | - 1
> ' | oh _ l
a | | \ Ips
S| Sy
8252 2
Sil 1
~~. Ix I 3!
ef | ; 2
I i ze I
f \% J 28
| t \3 | BR
| ge co FALL SITE TOWARDS l
‘ ' 5 \B SILT FENCES. 3 47 GTP39
o =
—-—. I ZO \ |>—-—-—
i ge fe 742m? i
1 D> 1
SHED || 2 S| I,
| a Ls
I 630m? | 8 aS
= =
2EY " © | IlsGTP156.
3RO lo EXISTING SEWER CONNECTION a ls
ihe POINT TO BE RELOCATED! CLEAR 13 bia
& OF PROPOSED STRUCTURES TO | & a|~
¥ i UNITY WATER STANDARDS AND TO |:
OQ a DEVELOPERS EXPENSE. | | |
JW} xs it I
O MHC)—4} &. sop | | |
LL: 1.53 [.° . C P
IL: 0.52 we TD
e 14.83 2R.P.2 BOUNDARY
EX. SCP
SINGLE sion | RP72986 [bstorer ®
SITE PLAN — SILT & SEDIMENT EROSION CONTROL
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
SITE DRAINAGE — CONSTRUCTION
ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS
TOWARDS THE CENTRE OF THE ALLOTMENT THEN TOWARDS
THE FRONT BOUNDARY WHERE RUNOFF WILL DRAIN THROUGH
THE SILT FENCES. IN NO INSTANCE SHALL THE ALLOTMENT
DRAIN INTO NEIGHBOURING ALLOTMENTS.
SITE DRAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE ARE TO
BE COVERED UNTIL THE SITE IS COMPLETED OR 10 BE
FITTED WITH SILT PROTECTION MEASURES TO THE APPROVAL
OF THE ENGINEER
P STOREY
DUST MOBILISATION FROM WIND ACTION
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF
STOCKPILES
MAINTENANCE OF SILT PROTECTION
SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT
PROTECTION MEASURES THROUGHOUT THE DURATION OF
THE PROJECT. ANY BREACHING OF THE PROTECTION
MEASURES MUST BE REMEDIATED IMMEDIATELY AND
GTF
REPORTED TO THE ENGINEER FOR CORRECTION MEASURES.
SILT RUNOFF PROTECTION IS TO BE MAINTAINED UNTIL
SUCH POINT THAT LANDSCAPING IS COMPLETED AND NOT
SUSCEPTABLE TO STORMWATER SCOUR.
LEGEND CONSTRUCTION NOTES
GENERAL:
e 1. DO NOT SCALE FROM THIS DRAWING,
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL
DRAWINGS ARE TO BE REFERRED 70 THE ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
— —— INDICATES OVERHEAD ELECTRICITY WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE
SUPPLY LINE DIAGRAM.
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY FINISHED
Ww ————_ INDICATES WATER MAIN APPROX TREATMENTS, EG. STAMPING
4, CONCRETE SURFACE TOLERANCE +5,0mm OVER 3.0m
ALIGNMENT, BUILDER TO CONFIRM 5, CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
EXACT LOCATION PRIOR TO WORKS 6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH.
7. EXPANSION JOINTS TO BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH
WIRE CUT ALONG JOINT.
— sw/ex —————__ INDICATES EXISTING STORMWATER 8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
DRAIN 9, FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF
CURVE
10, ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR TO
WORK COMMENCING
FILLING NOTES:
—THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE |S TO BE ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING
ENGINEERS FOR APPROVAL.
— THE FILL MATERIAL CLEAN GRANULAR MATERIAL (|.E. SAND TO A
CLAYEY SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
— THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1
CERTIFICATION WITH A MINIMUM RELATIVE FIELD DENSITY OF 95%.
COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
CONSULTING ENGINEERS FOR APPROVAL.
— FILLING AND COMPACTING ADJACENT EXISITING STRUCTURES IS TO BE
IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND
SPECIFCATIONS.
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN
ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE
FIELD DENSITY OF 95%.
— ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE
PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%.
— SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED
PRIOR TO CONSTRUCTION COMMENCING.
EXISTING SURFACE SPOT LEVELS.
—sat— SILT RETENTION FENCE TO DETAIL
INDICATES EXISTING SEWER LINE
900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES AND ———~
BURIED 300 INTO STABLE
GROUND.
SILT RETENTION
THE CONTRACTOR IS TO INSTALL APPROVED SILT
RETENTION FENCES PRIOR TO COMMENCING ANY
EARTHWORKS. THE FENCE IS TO BE CONSTRUCTED
ALONG THE LOWEST BOUNDARY AND RETURNED UP
SIDE BOUNDARIES TO ENSURE FULL STORMWATER
ENTRAPMENT. SURFACE RUNOFF FROM WITHIN THE
ALLLOTMENT MUST DRAIN TOWARDS THE FENCE AND
SHALL NOT ENTER NIEGHBOURING ALLOTMENTS
THROUGH THE USE OF SURFACE BUNDING OR
SCOUR PROTECTED DRAINS. THE FENCE MUST
REMAIN IN PLACE UNTIL SUCH TIME THAT FINISHED
LANDSCAPING AND DRAINAGE MEASURES ARE
INSTALLED
1200(L) 50 SQ HDWD
SPIES, 1800 CTRS DRIVE
600 INTO GROUND.
SILT FENCE DETAIL
Revision Description Date
Issue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
KEY The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
the written permission of SCG Consulting Engineers.
EX. SWPT EXISTING STORMWATER MANHOLE /PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. = REINFORCED CONCRETE HEADWALL
EX. SMH — EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
SWMH NEW 1050 STORMWATER MANHOLE
E.0.B. EXISTING EDGE OF BITUMEN
web:www.scg-engineers.com
‘ABN 40 098 481 899
~~ Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
( email:[email protected]
DEBUILD TA
K&C EXISTING KERB & CHANNEL
MSL NATURAL SURFACE LEVEL OPERATIONAL WORKS:
Ep ELECTRICAL PONER POLE SILT & SEDIMENT CONTROL
KERB EXISTING KERBING Project
Lots 2 & 3 RP/8252
Elizabeth St, NOOSAVILLE
Date: Drawn
Nov 16 CSK
0 1 2 3 4 7 . Checked: Drg No. Re
1:100 @ Al é
“1:20 © A3 |S Rehardeo 26281-OW2 | .
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.