Appendix A - Proposal Plans · MCU17/0004
Attached to the e-mail REC17/0002, MCU17/0004 & OPW17/0005 Boundary Realignment, Material Change of Use (2 x duplexes) & Op Works - 46-48 Elizabeth St, Noosaville.
Plans and drawings: the text below has words only, no drawings.
1.0 GENERAL Unless otherwise specified, reinstate all existing surfaces, Methods of protection shall include but not be limited to Sandy subsoils are preferred for these works. Clay soils 9.0 TURFING LANDSCAPE SPECIFICATION
All works to be performed by a licensed Contractor items, structures and anything disturbed or damaged by the following: may be used when in a dry state, but extreme care is Supply and install A-grade turf (variety specified on
familiar with landscape construction of this nature. The the performance of the works, to its condition at the necessary to ensure the resulting subsoil profiles are not drawings) to areas shown on drawings. Finishing levels
· Construction of temporary surface swales;
Contractor shall verify the location of utilities on site prior commencement of the Contract, other than that forming compacted or subject to excess moisture. should be flush with adjacent surfaces unless otherwise
· Diversion and dispersal of concentrated flows to point
to the commencement of construction, and ensure that part of or directly modified by the new work. detailed. Spread topsoil and grade surface to ensure a
where the water can pass through the site without Supply and install imported topsoil that complies with
they will not have an effect on the works. The Landscape Remove and cart away debris, spoil and surplus building level finished surface, which drains to nominated field
damage; Australian Standards to all turf (100mm) and garden
Subcontractor is advised to visit the site to satisfy materials from the site and buildings, with the exception gullies.
· Construction and maintenance of silt traps (eg hay (300mm) areas as shown on drawings unless otherwise
themselves as to local conditions, accessibility, storage of those works associated with others prior to practical
bales) to prevent the discharge of scoured materials to specified. Ensure modified site soil is free from stones, Turf to be free from nutgrass or other noxious weeds or
space, the full extent and character of the works and the completion.
downstream areas; sticks, roots, rubbish and material toxic to plant growth. any other material deleterious to plant growth.
site, the nature of the ground, the level of the subsoil
· Progressive restoration of disturbed areas; Modified topsoil shall have a friable structure with good Deliver the turf within 24 hours of cutting, and lay it
water, the supply of materials and water and the
2.0 EXCAVATION AND EARTHWORKS · Construction of temporary siltation fencing. drainage and high organic content. within 36 hours of cutting. Prevent it from drying out
execution of the contract generally. No claim will be
allowed for any alleged inadequacy of the description Inspect the site and ascertain the nature of excavation Any erosion damage reinstatement or cleanup as a result between cutting and laying.
Fire Ant Control
herein. Should there be any conflict, the Contractor shall required and the working conditions that will be of the contractor not adequately protecting the site,
The Landscape Subcontractor is to allow to carry out all
notify the Landscape designer immediately. encountered prior to the commencement of work. The materials or the works shall be the responsibility of the
necessary measures, inspections and safeguards to ensure 10.0 EDGING
location of topsoil stockpiles, roadway and cut landscape contractor.
Fire Ants do not enter the site via equipment, machinery, Supply and install all edging as per drawings. Paved edging
Figured dimensions shall take precedence over scale embankment profiles and water connection points must
Remove temporary erosion control measures when they materials and plant stock. shall sit on 100mm of concrete. Timber edging must be
measurements and large scale drawings over small scale. be taken into account.
are no longer required. constructed from hardwood and joined using galvanised
Unless otherwise specified the Drawings and Specification The Landscape Subcontractor shall ensure measures to
shall include everything reasonable for the proper and fittings.
minimise erosion and siltation relative to the works EXISTING TREES 6.0 FERTILISER
entire completion of the work, not withstanding any outlined in this specification, including staging of the Protect all existing vegetation unless otherwise specified. Provide proprietary fertilisers, delivered to the site in
omission in the Specification or Drawings. works, stabilisation of exposed surfaces, diversion drains All vegetation and weed removal is to be carried out using sealed bags marked to show manufacturer or vendor,
Verify discrepancies between Specification and Drawings 11.0 IRRIGATION
and silt traps over and above those already installed in industry standard accepted safety procedures and weight, fertiliser type, N:P:K ratio, recommended uses and The irrigation system shall be fully automatic provide even
with the Landscape Designer before proceeding with the civil works. equipment to ensure personal and environmental application rates. Store in a dry secure environment.
particular work. Failure to do so will not be taken as a cover to all grass and planting areas. Do not waste water.
protection. Avoid damage to nearby trees and Apply according to manufacturer's recommendations Take particular care to install the correct nozzle for the
reason to claim for extra work. Surface drainage shall be diverted clear of excavations and
surroundings. (rate/reapplication/watering). situation, and also allow for specific sprinkler and valve
covers shall be provided where necessary for safety.
Convey soils, earth, sand, loose debris and the like to or Ensure that run-off is not concentrated onto adjoining Garden beds - Slow Release - Osmocote or similar adjustment as will be required.
Grub out stumps and roots over 75mm diameter to a
from the site in a manner that will prevent dropping of properties and does not cause a nuisance thereto. approved. This Specification is not project or site specific. The intent
minimum depth of 500mm below sub-grade. Stumps less
materials on streets, public and private areas. Cover all Finished surfaces shall be graded in accordance with Tree plantings - Slow Release - Osmocote or similar is to provide a basis on which a professional standard,
than 75mm diameter shall be cut off at ground level and
loads with taut heavy-duty purpose fitted tarpaulins to Construction Plans. approved. fully operational, compliant (with all applicable industry,
treated to prevent regrowth.
ensure no loss of load or dust. Ensure that the wheels, Erect barriers as required to prevent excavated material Grassing - Growforce 301 or similar approved100kg/Ha local authority and Australian standards) irrigation system
tracks and body surfaces of all vehicles and plant leaving and rocks from intruding onto adjoining properties. Completely remove woody weeds within the extent of can be provided for the site. Submission of the design to
the site are free of mud and that mud is not carried onto Establish exact locations of services, drains, sewers and works. Local Authority for approval and all costs involved are the
adjacent paved streets or other areas. 7.0 MULCH
water supply lines and points prior to commencing works responsibility of the irrigation subcontractor.
Supply and install organic mulch to a minimum of 100mm
and ensure their protection during the works. Fully automatic commercial quality system:
Check all delivery tickets, labels, identification marks 3.0 FINISHED LEVELS & GRADES and gravel mulch to a minimum of 50mm. Ensure mulch
and, the goods themselves to ensure that all products All major earthworks associated with this project shall be Minimum cross falls of 1:50 on planting and pathways to meets Australian Standards and is free from deleterious · 24 station (min) commercial controller in lockable box;
comply with the project documents. Where different carried out as part of the Landscape Works. drainage collection points and overflow points. Planting matter, fungi and disease. Mulch shall finish 25mm below · Mains tapping point back flow device, including dual
types of any product are specified, check to ensure that areas should not exceed 1:3. adjacent surfaces. check valve in lockable box to council requirements, to
the correct type is being used in each location. In ENVIRONMENTAL PROTECTION
be undertaken by builder refer to hydraulic drawings;
particular, check that:- The Landscape Subcontractor should consider in every
· Filter at back flow;
All stock has been adequately protected for loading and in instance whether the use of chemicals is strictly necessary 4.0 CULTIVATION & SUBSURFACE DRAINAGE 8.0 PLANT SUPPLY
· Control wire;
transit. before application, and assess the product, site conditions The Landscape Subcontractor is to provide for sufficient The Contractor shall supply plants as specified in the
· Conduit access to all isolated areas;
The sources, types, qualities, finishes and colours are and species to ensure minimum risk to his employees, surface and sub-surface drainage to garden and grass planting schedule. Plants shall be delivered on site true to
· Drip irrigation to new garden areas;
correct, and match any approved samples. other users of the site and the environment. areas to ensure adequately drained soft landscaped areas pot size, species and type, and free of weeds, disease and
· Pop-up irrigation to grassed areas;
The correct species, cultivars, pot sizes, plant height, girth fungal infection. Substitutes will not be made without
free from surface ponding water and heavy/ waterlogged · Coordinate penetrations and suspended under slab
or spread have been supplied for each consignment from When using pesticides the Landscape Subcontractor must prior consent of the Landscape Designer.
soils. Surface and sub-surface drainage is to aid in the conduit and copper work with builder.
the supplier. use a certified operator and take appropriate safety
healthy growth and continued thriving of all plant stock All plants shall be true to scheduled nomenclature, well · An approved rainswitch override is to be installed to
All materials should be clean, undamaged and otherwise precautions in accordance with all current statutory
and grass areas. formed, hardened off and disease free nursery stock. cut-off irrigation after a pre-set rainfall level has been
in good condition. regulations.
They shall be container grown in potting soil with root reached. Install to manufacturers' directions with a
Where appropriate protective covers should be intact Comply with the relevant Australian Standards to the
extent that they are relevant and not over-ridden by the system firmly established but with no large roots growing manual override switch.
with unbroken seals. The Landscape Subcontractor must dispose of unused
specification. out of the container. No plant shall be pot bound.
and unwanted containers and chemicals in a safe way in
Ensure that trunks and branches are free of dieback, Give 10 working days notice of the proposed date for the
Ensure adequate provision is made for the protection and accordance with the methods approved by the relevant
Cultivate sub-grade to a minimum depth of 150mm prior cavities, sunburn and secretions. Trunk and branches are instruction. Provide written operational instructions for
storage of deliveries. In particular ensure that:- authorities. Disposal will be off site.
to placing topsoil to all planting and turf areas on ground. to be evenly tapered and textured typical of the specie. the installation under the Contract. The defects liability
Materials which may deteriorate with storage must not period for the irrigation system shall be 52 weeks from
be stockpiled on site. Herbicide must never drift, fall or run-off onto open water Plant material is to be matured enough to support
or onto adjacent sites, gardens or ground not intended for themselves without staking. the date of Practical Completion.
Adequate and appropriate provision is made for storage
treatment. 5.0 FILL & TOPSOIL
prior to deliveries arriving on site. ALL materials in
Fill and subsoil material used to make up levels shall be Branches should be evenly distributed, exhibit a full well
storage are to be suitably protected from physical damage The Landscape Subcontractor will be responsible for 12.0 TANK INSTALLATION
and extremes of weather and to minimise hazards re-used from previous earthworks operations on site or formed canopy that occupies a minimum 1/3 of the
assessing any potential wildlife problem when tendering imported as required and shall be excavated material Supply and install tank to size and location specified as per
persons, materials and equipment. Keep storage areas and during the course of the works. Allowance must be overall current height. Specimens are to be prepared for
which is composed of natural site subsoils but free from: drawing by others.
neat and tidy. their intended purpose. For ex-ground stock where
made for any protection or control of such pests the
Do not use roads, driveways, paths hard standings and the Landscape Subcontractor deems necessary. Subsequent canopy modification is intended, provide details of how
· Logs, stumps or other un-decomposed vegetative each specimen's visual character will be at time of
like forming part of the works for access or storage unless wallaby or rabbit damage to planting or other works will 13.0 LIGHTING
material. delivery.
prior written approval has been given. be deemed as defective work and subject to replacement All lighting is to be carried out out a qualified electrician.
· Materials susceptible to spontaneous combustion.
as per the normal contract conditions. Foliage shall be evenly distributed across the crown in All recommended lighting is merely a suggestion, with the
Operatives must be appropriately skilled and experienced · Clay, of liquid limit exceeding 90 and/or plasticity index
proportion to the branching structure as well as be of a ultimate style of lighting used at the description of the
for the type and quality of work and familiar with the exceeding 65.
Any proposed method of protection or control of pests true colour typical of the specie, dense and of good size. client.
terms of the specification. · Refuse and rubbish, including paper, plastics, rubber,
must be agreed with the Superintendent prior to use on Ensure foliage is free of deficiencies and burn. Plant
metal and all type of containers.
Inspect products/materials/stock carefully before use and site. material is to be 'hardened' to full sun and exposed
· Concrete, bitumen, brick, steel, masonry rubble or other
reject any which are defective. conditions by the supplier to ensure successful plant 14.0 MAINTENANCE/ESTABLISHMENT PERIOD
deleterious material.
Use products/materials only in the method and for the Restrict dust caused by the Works to a minimum. Take all establishment into the site environment. For ex-ground Maintenance of all landscape works is to be carried out by
· Toxic substances and compounds that would inhibit
purpose recommended by the manufacturer. practicable steps to minimise noise resulting from the stock apply an anti-transpirant. the Contractor until completion of the landscape works.
healthy plant life.
Ensure appropriate quantities are utilised, provide Works. Maintenance includes replacement of dead and/or
· Any material not capable of being satisfactorily At the time of the last plant stock review prior to site
adequate measures for mixing and spreading of all diseased plant stock, removal of weeds and rubbish, weed
EROSION AND SEDIMENT CONTROL compacted. delivery, plant material is to conform with the specified
products or materials. spraying and mowing.
Set out components or stock to ensure correct Take all precautions necessary to prevent erosion, minimum plant sizes in the Plant Schedule. Plants shall not
contamination and sedimentation of the site, surrounding Any such material shall be removed from site to the exhibit signs of having been stressed at any stage during
positioning and spacings are achieved.
areas, water and drainage systems, in accordance with Landscape Subcontractors own tip. their development due to inadequate watering, excessive
Protect finished work from subsequent operations and
interference by others as project progresses. the Environmental Protection (Water) Policy 1997. shade/sunlight, suffered physical damage or have
restricted habit due to growth in nursery rows.
seed landscape design NOTES
Use figured dimensions in preference to scaled.
Notify the Landscape Designer before proceeding if any anomaly is found
between this drawing and conditions on site.
Attn: Developer/Builder
Landscape Compliance Certification may be
necessary at BA Stage of development.
DRAWING
specification
CLIENT
KIDD + Co
PROJECT
160614
Please contact Landscape Designer for Detailed drawing no. 160614 01
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
Details not certified for construction. Contractor responsible for structural
engineering certifications,hydraulic certifications & building approvals.
Levels taken from information provided from the Client's site setout plan.
Confirm all finished levels on site prior to excavation.
Landscape Design to complete approval package
requirements (04 1616 9858)
drawn rs DESIGNERS 46 ‐ 48 Elizabeth Street
Noosaville QLD 4566
www.seedlandscapes.com.au © 2016 SEED Landscapes ISSUE
abn 85 468 007 510
all rights reserved. the information contained in the document is copyright
and cannot be reproduced or copied by any means without
the written permission of seed landscapes.
14/12/16
A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
APPENDIX A - PROPOSAL PLANS.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.