Delegated Report - Code - Planning OPW26 0105(As Published) · OPW26/0105
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Operational Works - Earthworks, Stormwater
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. Where there are inconsistencies between the approved plan
and the conditions of the approval, the conditions of the approval override the approved
plans.
The approved plans are listed in the following table unless otherwise amended by these
conditions.
Plan No. Rev. Plan/Document Name Date
C04-0001 C Civil Services Bulk Earthworks Plan 10 July 2026
Prepared by ACOR
C05-0001 C Civil Services General Arrangement Plan 10 July 2026
Prepared by ACOR
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 29 September 2028, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. Submit a condition report documenting any existing defects in the road reserve or
infrastructure, including photographs of the site frontage. The report must be submitted to
Council prior to the commencement of works.
4. Submit a Construction Management Plan to Council prior to the commencement of works.
The Construction Management Plan must specifically address the following:
a. traffic management during all aspects of the construct phase including:
i. a Traffic Management Plan in accordance with Manual of Uniform Traffic Control
Devices (MUTCD) detailing all temporary signage and traffic control measures
prior to construction;
ii. maintenance of safe vehicle and pedestrian access across the frontage of the
site both during daily construction and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
iv. adequate parking arrangements for construction workers and deliveries; and
v. no queuing of trucks is permitted on residential streets;
b. maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures;
Page 4 of 9
Document Set ID: 25208649
Version: 2, Version Date: 29/09/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW26 0105(As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.