Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Planning Scheme
Part 8 Overlays
8.2 Overlay codes
The overlay codes for the planning scheme are:
(a) Acid Sulfate Soils Overlay Code
(b) Biodiversity, Waterways and Wetlands Overlay Code
(c) Bushfire Hazard Overlay Code
(d) Coastal Protection and Scenic Amenity Overlay Code
(e) Extractive Resources Overlay Code
(f) Flood Hazard Overlay Code
(g) Heritage Overlay Code
(h) Landslide Hazard Overlay Code
(i) Regional Infrastructure Overlay Code
8.2.3 Bushfire Hazard Overlay Code
Application
(1) This code applies to assessable development:
(a) subject to the Bushfire Hazard Overlay shown on the overlay maps contained within Schedule 2 (Mapping); and
(b) identified as requiring assessment against the Bushfire Hazard overlay code by the tables of assessment in Part 5
(Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development.
Editor's note—Planning scheme policy 9 for assessment of natural hazards provides guidance on preparing bushfire hazard
assessments and mitigation reports.
Purpose and overall outcomes
(1) The purpose of the Bushfire Hazard overlay code is to ensure that development avoids or mitigates the potential adverse
impacts of bushfire on people, property, economic activity and the environment.
(2) The overall outcomes sought for the Bushfire Hazard overlay code are:
(a) Development in areas at risk from bushfire hazard is compatible with the nature of the hazard.
(b) The risk to people, property and the natural environment from bushfire hazard is minimised.
(c) Development does not result in a material increase in the extent and severity of bushfire hazard.
(d) Bushfire risk mitigation treatments are accommodated in a manner that avoids or minimises impacts on the natural
environment and ecological processes.
(e) Development supports and does not unduly burden disaster management response or recovery capacity and
capabilities.
(f) Community infrastructure essential to the health, safety and wellbeing of the community is located and designed to
function effectively during and immediately after a bushfire event.
(g) Development avoids the release of hazardous materials as a result of a bushfire hazard event.
Table 8.2.3.3 Criteria for assessable development
Performance outcomes Acceptable outcomes
Safety of people and property
PO1 AO1.1
Development maintains the safety of people and property from Development which will materially increase the number of
**FINAL DRAFT Post Consultation 2019** Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.