Skip to the record
Search everything, all in one place.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                                Acceptable Outcomes
                                                                          (i)   construction of any required alterations to public utility
                                                                                mains, services or installations;
                                                                          (j)   stormwater drainage works; and
                                                                          (k)   installation of electrical conduits.

      PO15
      Any alterations or repairs to infrastructure as a result of the     No acceptable outcome provided
      development are made at no cost to Council.
      PO16
      Road infrastructure is proven to be suitable for its use prior to   No acceptable outcome provided
      Council accepting the dedicated asset.




     Table 9.4.8.7.3 Criteria for assessable development (part)
      Performance outcomes                                                Acceptable Outcomes
      Staged development
      PO17
      Staged development is planned, designed and constructed to          No acceptable outcome provided
      ensure that—
      (a)   each stage of the development can be constructed
            without interruption to services and utilities provided to
            the previous stages;
      (b)   the infrastructure provided is capable of servicing the
            entire development; and
      (c)   the materials used are consistent throughout the
            development.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                                     Page 8 of 8
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.