Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable Outcomes
disturbed areas are reinstated and revegetated on
Editor’s Note— Measures may include fauna underpasses,
completion of works; and
ropes, fencing and the like.
(f) minimise bulk earthworks.
AO12.4
Road infrastructure within or adjacent to native habitat
incorporates fences which allow for protected wildlife
movement and controls unrestricted access of domestic cats
and dogs.
AO12.5
Native vegetation is protected from clearing or construction
activities by—
(a) clearly marking vegetation to be retained with flagging
tape;
(b) installing protective fencing around the dripline of
vegetation; and
(c) ensuring stock piling, storage and vehicle parking occur
outside the areas of vegetation to be retained.
AO12.6
Where clearance of habitat is unavoidable, once the area
disturbed by the works is reestablished, replacement habitat
is planted in proximity of the works to create native fauna
habitat suitable for the area and maintained for the life of the
works.
PO13 AO13
Road infrastructure is constructed to minimise adverse Road infrastructure is constructed in accordance with
environmental impacts, including from runoff and erosion. Council’s Planning Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and earthworks
Table 9.4.8.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
Table 9.4.8.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
External Works and Infrastructure
PO14 AO14
Development is provided with external works— Where not already existing, the following infrastructure
(a) along the full extent of the frontage of the site to an components are provided at the frontage of the site—
appropriate standard having regard to the specified (a) full width sealed road;
function of the road; and (b) concrete kerb and channel where appropriate;
(b) provided beyond the site’s frontage if required. (c) forming and grading to footpaths;
(d) vehicular kerb and footpath crossings;
(e) a constructed bikeway;
(f) a constructed footpath;
(g) a constructed carriageway;
(h) required alterations to public utility mains, services or
installations;
**FINAL DRAFT Post Consultation 2019** Page 7 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.