2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
Water quality treatment infrastructure to be dedicated as Detailed life cycle costing is provided for the entire treatment
public assets are proven to be suitable for its use and of a train system including replacement costs of asset parts.
cost effective and efficient standard.
AO8.2 Treatment systems dedicated as public assets are
designed to minimise maintenance, renewal and adaption
costs and the requirement for specialised equipment, material
or maintenance techniques.
AO8.3
Vegetated stormwater management systems to be dedicated
as public assets are established and maintained during the
maintenance period to ensure optimal vegetated growth and
that the functional elements of the system achieve the design
function at the end of the maintenance period.
PO9 AO9.1
Treatment systems are designed to eliminate or minimise Free draining inlets and outlets are provided to ensure that
health, safety and aesthetic hazards, including risks associated waters do not pond for more than 24 hours.
with insect breeding, odour and public safety.
AO9.2
Developments are designed to eliminate retaining walls in
excess of 0.8m for any water quality treatment device.
Table 9.4.9.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Hydrology and waterway stability
PO10 AO10
Development prevents increased bed and bank erosion and The development is designed to:
sedimentation in receiving waterways by avoiding changes (a) limit the peak 1 year ARI event discharge within the
in low rate, peak flow runoff and flow duration. receiving waterway to the predevelopment peak 1 year
discharge;
(b) maximise pervious areas by using pervious alternatives
for otherwise impervious areas wherever possible;
(c) provide for capture and reuse of stormwater for non
potable purposes for gardening, toilet flushing, laundry
and hot water supply uses;
(d) incorporate appropriate detention features; and
(e) incorporate natural channel design principles
Editor’s note: The Sustainable Building Design Code includes
requirements for stormwater capture and reuse.
PO11 AO11.1
Water sensitive urban design principles are applied to achieve The design and construction of a natural channel or natural
multifunctional design of waterways, wetlands and drainage channel rehabilitation works are in accordance with the Natural
lines that provide for: Channel Design Guidelines (Brisbane City Council) having
(a) stormwater conveyance that uses natural channel regard to local topography, geology and geomorphology.
design;
AO11.2
(b) protection of landscape features and ecological
Landscape features, plant species and habitat types used in
important areas including terrestrial and aquatic habitat;
stormwater conveyance channels are complementary to the
(c) aesthetic and passive recreation values; local context and natural waterways.
(d) flood management and conveyance of external
catchment stormwater through the development; AO11.3
Bank and bed stability and planting densities result in a stable
(e) landscaping that incorporates local native species; and
channel over the long term and minimal potential for pest plant
(f) bed and bank stability. species.
**FINAL DRAFT Post Consultation 2019** Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.