Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                          Acceptable Outcomes


                                                                    AO11.4
                                                                    Water Sensitive Design measures are incorporated into the
                                                                    development, as detailed in the document Water Sensitive
                                                                    Designs small improvements, new ideas, concepts and sketch
                                                                    designs for stormwater filtration systems (Healthy Waterways
                                                                    Water by Design).

                                                                    AO11.5
                                                                    Floodplain management is designed in accordance with the
                                                                    Framework for the Integration of Flood and Stormwater
                                                                    Management into Open Space published by Healthy Waterways
                                                                    Water by Design (version current at the time of development
                                                                    application)
      PO12                                                          AO12.1
      Development protects in­stream ecology by maintaining pre­ Where run­off from or within the site passes through or drains
      development low flow discharge regimes and maintaining     to natural channels, waterways or wetlands, development
      fish passages.                                             protects in­steam ecology by maintaining pre­development low
                                                                    flow discharge regimes in accordance with the frequent flow
                                                                    management objectives in PSP6 Engineering Design
                                                                    Standards ­ Roads, drainage and earthworks

                                                                    AO12.2
                                                                    Instream structures such as roads, bridges, culverts, and other
                                                                    stormwater infrastructure do not cause barriers to fish passage
                                                                    and facilitate the movement of terrestrial and aquatic fauna
                                                                    along waterway corridors.

                                                                    AO12.3
                                                                    Benthic substrate retains a continuous grade with the
                                                                    direction of flow consistent with the natural bed profile.
      PO13                                                          AO13.1
      Development is designed and constructed to maintain surface   The location and form of stormwater discharge points do not
      and ground water balances that sustain the environmental      alter the pre­development hydrology of receiving surface water
      values of water dependent ecosystems, including downstream    or groundwater.
      aquatic, riparian, wetland and terrestrial ecosystems.
                                                                    AO13.2
                                                                    Developments located on groundwater recharge or discharge
                                                                    areas are designed and managed in accordance with a
                                                                    groundwater recharge and discharge management plan
                                                                    prepared by a suitably experienced and qualified groundwater
                                                                    hydrologist. The groundwater recharge or discharge must
                                                                    demonstrate that the development does not affect groundwater
                                                                    balances beyond the property boundaries.

                                                                    Editor's Note— PSP6 Engineering Design Standards ­ Roads,
                                                                    drainage and earthworks provides guidance on prepare a
                                                                    groundwater recharge and discharge plan.



     Table 9.4.9.8.3 Criteria for assessment (part)
      Performance Outcomes                                          Acceptable Outcomes
      Construction and establishment of stormwater management
      systems
      PO14                                                          AO14.1




**FINAL DRAFT ­ Post Consultation 2019**                                                                                         Page 5 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.