2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                           Acceptable Outcomes
      Construction methods provide for appropriate controls to      An erosion and sediment control plan prepared in accordance
      avoid entry and transport of litter, sediment, and associated with the International Erosion Control Association Best Practice
                                                                    Books demonstrates that the capture and release of
      prescribed water contaminants into receiving waters.
                                                                     stormwater achieves the design objectives listed in Table A:
                                                                     Construction phase – stormwater management design
      Editor's note— Water contaminants are prescribed in the        objectives of the State Planning Policy (Appendix 2).
      Environmental Protection Act 1994.
                                                                     Editor’s note— PSP6 Engineering Design Standards ­ Roads,
                                                                     drainage and earthworks provides guidance on requirements
                                                                     for preparing an Erosion Management Plan.

                                                                     AO14.2
                                                                     Construction works are designed and managed to restrict the
                                                                     extent of clearing and soil exposure to the minimum necessary
                                                                     for access, and safe construction at any one time.

                                                                     AO14.3
                                                                     For buildings:
                                                                     (a)    upstream runoff is diverted around the construction site;
                                                                     (b)    sediment barriers are provided downslope of disturbed
                                                                            areas to prevent sediment washing into gutters, drains
                                                                            and waterways , wetlands or drainage lines either on or
                                                                            off the site; and
                                                                     (c)    temporary or permanent downpipes are connected to the
                                                                            stormwater system before laying the roof; or
                                                                     (d)    localised erosion is avoided by directing flow from
                                                                            downpipes over non­erosive areas.

                                                                     AO14.4
                                                                     Chemical flocculants used as part of an erosion and sediment
                                                                     control plan do not harm the environmental values within
                                                                     receiving waters.

                                                                     AO14.5
                                                                     Appropriately sized litter containment areas, with provision for
                                                                     sorting recyclables are provided for the type of litter expected to
                                                                     be generated onsite.

     Table 9.4.9.8.3 Criteria for assessment (part)
      Performance Outcomes                                           Acceptable Outcomes
      Wastewater management and effluent disposal

      PO15                                                      AO15
      Development does not discharge wastewater unless it can   Wastewater (non­sewage) generated from the development
      be demonstrated to not compromise environmental values of is collected and contained on­site, and is:
      waters and water quality objectives.                      (a)    lawfully disposed to sewer; or
                                                                     (b)    transferred off­site for treatment/disposal to an
      Editor’s Note—Environmental values of waters and water                appropriately licenced facility;
      quality objectives are prescribed in Schedule 1 of the                reused on­site in a closed­cycle irrigation scheme,
                                                                     (c)
      Environmental Protection (Water) Policy 2009.                         industrial processes, washing or cleaning or other
                                                                            purpose; or
                                                                     (d)    treated to meet the drinking water supply environmental
                                                                            values prior to release.


                                                                     Editor’s Note—The Plumbing and Drainage Act 2003 sets


**FINAL DRAFT ­ Post Consultation 2019**                                                                                            Page 6 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.