Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance Outcomes Acceptable Outcomes
Construction methods provide for appropriate controls to An erosion and sediment control plan prepared in accordance
avoid entry and transport of litter, sediment, and associated with the International Erosion Control Association Best Practice
Books demonstrates that the capture and release of
prescribed water contaminants into receiving waters.
stormwater achieves the design objectives listed in Table A:
Construction phase – stormwater management design
Editor's note— Water contaminants are prescribed in the objectives of the State Planning Policy (Appendix 2).
Environmental Protection Act 1994.
Editor’s note— PSP6 Engineering Design Standards Roads,
drainage and earthworks provides guidance on requirements
for preparing an Erosion Management Plan.
AO14.2
Construction works are designed and managed to restrict the
extent of clearing and soil exposure to the minimum necessary
for access, and safe construction at any one time.
AO14.3
For buildings:
(a) upstream runoff is diverted around the construction site;
(b) sediment barriers are provided downslope of disturbed
areas to prevent sediment washing into gutters, drains
and waterways , wetlands or drainage lines either on or
off the site; and
(c) temporary or permanent downpipes are connected to the
stormwater system before laying the roof; or
(d) localised erosion is avoided by directing flow from
downpipes over nonerosive areas.
AO14.4
Chemical flocculants used as part of an erosion and sediment
control plan do not harm the environmental values within
receiving waters.
AO14.5
Appropriately sized litter containment areas, with provision for
sorting recyclables are provided for the type of litter expected to
be generated onsite.
Table 9.4.9.8.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Wastewater management and effluent disposal
PO15 AO15
Development does not discharge wastewater unless it can Wastewater (nonsewage) generated from the development
be demonstrated to not compromise environmental values of is collected and contained onsite, and is:
waters and water quality objectives. (a) lawfully disposed to sewer; or
(b) transferred offsite for treatment/disposal to an
Editor’s Note—Environmental values of waters and water appropriately licenced facility;
quality objectives are prescribed in Schedule 1 of the reused onsite in a closedcycle irrigation scheme,
(c)
Environmental Protection (Water) Policy 2009. industrial processes, washing or cleaning or other
purpose; or
(d) treated to meet the drinking water supply environmental
values prior to release.
Editor’s Note—The Plumbing and Drainage Act 2003 sets
**FINAL DRAFT Post Consultation 2019** Page 6 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.