Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Planning Scheme
Part 9 Development codes
9.4 Works codes
9.4.10.9 Waterways Works Code
Application
(1) This code applies to assessable development identified as requiring assessment against the Waterways works code by the
tables of assessment in Part 5 (Tables of assessment).
(2) All provisions in this code are assessment benchmarks for applicable assessable development
Editor's Note—This code must be read in conjunction with the ‘Code for assessable development that is prescribed tidal work’ contained in
Schedule 3 of the Coastal Protection and Management Regulation 2017.
Purpose and overall outcomes
(1) The purpose of the Waterways works code is to ensure the suitability of development within tidal areas and the waterways of
the Noosa Waters Estate.
(2) The overall outcomes sought for of the Waterways works code are:
(a) Development is compatible with the character and amenity of its surrounding area.
(b) Development is avoided in largely undeveloped tidal areas and undeveloped sections of tidal waterways.
(c) Development ensures there is no increase to the scale and intensity of commercial operations on the Noosa River
and additional commercial leases are avoided.
(d) Development is designed and constructed in a way to ensure it is structurally sound.
(e) Development is safe for use.
(f) Development does not adversely affect—
(i) the amenity of the surrounding area including by noise, lighting, odour and air pollutants;
(ii) existing public access to any foreshore areas or tidal waters;
(iii) safety and navigation of any waterways;
(iv) natural values of waterways, including water quality and bed and bank habitat;
(v) the flood storage area of waterways of the Noosa Waters Estate; and
(vi) the structural integrity, operation or maintenance of any existing structure.
Table 9.4.10.9.3 Criteria for assessment
Table 9.4.10.9.3 Criteria for assessment (part)
Performance Outcomes Acceptable Outcomes
Landing prescribed tidal works outside Noosa Waters Estate
Role and function
PO1 No acceptable outcome provided
A landing—
(a) provides a high level of amenity with no adverse effects
on the surrounding area including changes to light,
views, air quality and noise;
(b) is compatible with the scenic values of the waterway;
and
(c) does not adversely affect the natural landscape character
and vegetation along the foreshore.
Landings in conjunction with a commercial use
**FINAL DRAFT Post Consultation 2019** Page 1 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.