Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                                Acceptable Outcomes
      PO2
      Development—                                                        No acceptable outcome provided
      (a)   does not detract from the function and viability of centres
            or nearby businesses;
      (b)   does not increase the overall scale and intensity of any
            commercial operation;
      (c)   does not provide additional commercial leases on the
            Noosa River;
      (d)   ensures no net increase in site cover or gross floor area
            of buildings or structures;
      (e)   uses materials, natural finishes and colours that blend
            with the surrounding natural landscape; and
      (f)   reflects the character and setting of the locality (such as
            timber and tin construction with a traditional pitched roof
            design).

      PO3
      All commercial activities including, the loading and unloading of No acceptable outcome provided
      passengers and boat docking is confined to the commercial
      lease areas of the respective commercial operation.

      Editor’s Note— The commercial lease area is the lease area at
      the time of gazettal of this plan.
      Car parking
      PO4                                                                 No acceptable outcome provided
      Sufficient car parking is provided on site to accommodate the
      number and type of vehicles likely to be generated by the use.

     Table 9.4.10.9.3 Criteria for assessment (part)
      Performance Outcomes                                                Acceptable Outcomes
      Siting ­ prescribed tidal works outside Noosa Waters Estate
      PO5
      The construction of new jetties, wharves and boardwalks on          No acceptable outcome provided
      freehold land in largely undeveloped sections of a watercourse
      is avoided.
      PO6
      The construction of new jetties and wharves on public lands is      No acceptable outcome provided
      avoided unless there is a clear demonstrated community
      benefit and community support.
      PO7                                                                 AO7
      Prescribed tidal works are not located on the southern bank of      Refer to Figure 9.4.10.9.3M— Noosa Heads Lions Park to
      the Noosa River and tributaries between the Noosa Heads             Weyba Bridge.
      Lions Park and Weyba Bridge (Refer to Figure 9.4.10.9.3M).

      PO8
      Prescribed tidal works do not include extensions of on­site         No acceptable outcome provided
      recreational areas unless there is a clear demonstrated
      community benefit and community support.

     Table 9.4.10.9.3 Criteria for assessment (part)
      Performance Outcomes                                                Acceptable Outcomes
      Character, amenity & access ­ prescribed tidal works outside Noosa Waters Estate
      Site Responsive Design
      PO9                                                                 AO9.1


**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 2 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.