Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                            Acceptable Outcomes
      Landings are not roofed.                                        No acceptable outcome provided

     Table 9.4.11.9.3 Criteria for assessment (part)
      Performance Outcomes                                            Acceptable Outcomes
      Design, Construction and Safety for Jetties within Noosa Waters Estate waterways
      PO18                                                            AO18
      Structures such as handrails, light bollards, piers and pumping No acceptable outcome provided.
      equipment for semi­submersible floating docks have a
      maximum height of 1100mm above the jetty floor.
      PO19                                                         AO19.1
      Development is designed and constructed for the sole purpose Jetties—
      of providing access to vessels and are sited and designed to (a)    are a maximum width of 1.5 metres;
      avoid—
                                                                   (b)    a maximum length of a jetty head is not more than 7
      (a)    cluttering of waterways;                                     metres (Refer Figure 9.4.10.9.3C);
      (b)    excessive traffic volumes within foreshore areas, on  (c)    constructed predominantly of timber;
             adjoining lands and within the waterway; and
                                                                   (d)    are not constructed parallel to the revetment wall; and
      (c)    unacceptable risks to personal and public safety.            extend a maximum of 10 metres past the quayline.

                                                                      AO19.2
                                                                      For “Y” and “T” shaped jetty heads or other shaped jetty heads
                                                                      —
                                                                      (a)   a maximum area of 10.5m² excluding any walkway is
                                                                            provided; and
                                                                      (b)   a walkway with a minimum length of 3 metres is
                                                                            provided to the jetty head (Refer Figure 9.4.10.9.3D).

                                                                      AO19.3
                                                                      Jetties have independent support structures and are not
                                                                      supported by the revetment wall.

                                                                      AO19.4
                                                                      Seep holes in the revetment wall are not obstructed by any jetty.

                                                                      AO19.5
                                                                      For lots comprising a dwelling house or dual occupancy, a
                                                                      maximum of one jetty per development is constructed.

                                                                      AO19.6
                                                                      Multiple dwellings with common property along the waterway
                                                                      frontage meet the following—
                                                                      (a)   a maximum of 2 jetties per multiple dwelling;
                                                                      (b)   jetties are shared between unit owners;
                                                                      (c)   a minimum of 20 metres separation is provided between
                                                                            each jetty;
                                                                      (d)   the jetty is setback a minimum of 3 metres from the
                                                                            prolongation of boundaries; and
                                                                      (e)   jetty heads and pontoons are not constructed (Refer
                                                                            Figure 9.4.10.9.3F).

                                                                      AO19.7
                                                                      For multiple dwellings where each unit has its own individual
                                                                      canal frontage—
                                                                      (a)   a joint application with the adjoining owner is made; and


**FINAL DRAFT ­ Post Consultation 2019**                                                                                          Page 6 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.