Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                               Acceptable Outcomes
                                                                         (b)   jetties are constructed as follows—
                                                                               (i)     the jetty is shared between two unit owners;
                                                                               (ii)    the jetty straddles the common boundary of the
                                                                                       two units;
                                                                               (iii)   jetty heads and pontoons are not constructed; and
                                                                               (iv)    fencing between the two properties is setback a
                                                                                       minimum 1 metre from the revetment wall to allow
                                                                                       for efficient access to the jetty by both owners
                                                                                       (Refer Figure 9.4.10.9.3G).
                                                                         Editor’s Note—Council is unlikely to support a jetty application
                                                                         for the exclusive use of one unit owner.

                                                                         AO19.8
                                                                         Walkways serving jetties have at least one rigid handrail fitted
                                                                         and the walkway is a minimum width of 750 millimetres and a
                                                                         maximum width of 1.5 metres where—
                                                                         (a)   the walking surface of the jetty is constructed level with
                                                                               the top of the revetment wall;
                                                                         (b)   water reticulation systems are fitted with a mechanical
                                                                               backflow prevention device; and
                                                                         (c)   electrical reticulation systems carrying electricity in
                                                                               excess of 24 volts are not to extend beyond the revetment
                                                                               wall.

                                                                         AO19.9
                                                                         Any lower­level platform, or siding, along the jetty walkway has a
                                                                         maximum width of 500 millimetres and does not exceed 2m²
                                                                         and does not interfere with the prolongation of boundaries as
                                                                         indicated by Acceptable outcomes AO15.1, AO15.2 & AO15.3.
      PO20
      Pontoons and boat ramps are not constructed within the Noosa No acceptable outcome provided
      Waters Estate waterways.

     Table 9.4.11.9.3 Criteria for assessment (part)
      Performance Outcomes                                               Acceptable Outcomes
      Boat lifting devices within Noosa Waters Estate waterways
      PO21                                                               AO21.1
      Boat lifting devices are only constructed in the absence of a      Boat lifting devices are only located in conjunction with an
      boat ramp and are designed and located to—                         approved jetty where—
      (a)   ensure that unacceptable risks to personal and public        (a)   the boat lifting device does not extend into the waterway
            safety are unlikely to be caused;                                  beyond the end of the approved jetty;
      (b)   avoid cluttering of the waterway;                            (b)   the boat lifting device is no greater than 4 metres in width
      (c)   ensure that visual amenity of the foreshore and waterway           or for a jetty hoist, 2 metres in width;
            is maintained including—                                 (c)       the boat lifting device is located adjacent the walkway to
            (i)    avoiding bulky or large structures; and                     the jetty and is generally perpendicular to the revetment
                                                                               wall;
            (ii)   minimising structures above the water level;
                                                                         (d)   the highest part of the boat lifting device is no higher than
      (d)   ensure the structural integrity of the works is maintained         the top of the revetment wall under normal canal water
            and not compromised; and                                           level conditions;
      (e)   avoid a secondary boat lifting device (floating dock) that   (e)   the boat lifting device is not located on the jetty head; and
            exceeds 8m².
                                                                         (f)   the outermost projection of any boatlifting device is
                                                                               setback a minimum of 1 metre from the prolongation of
                                                                               the boundaries.


**FINAL DRAFT ­ Post Consultation 2019**                                                                                                Page 7 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.