Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                              Acceptable Outcomes

                                                                        AO21.2
                                                                        Only one primary boat lifting device and one secondary small
                                                                        device (floating dock) per jetty. The small secondary floating
                                                                        dock is no greater than 8m² and purpose designed for personal
                                                                        watercraft such as jet skis, kayaks, paddleboards etc.

                                                                        AO21.3
                                                                        A shared jetty contains only one boat lifting device on either side
                                                                        of the jetty.

                                                                        AO21.4
                                                                        The structure may be securely attached, excluding roped,
                                                                        chains and straps, to an existing jetty where a structural
                                                                        engineer's report for the design is provided certifying that the
                                                                        jetty is structurally capable of supporting the boat lifting device
                                                                        (Refer to Figures 9.4.10.9.3H – 9.4.10.9.3J for examples of boat
                                                                        lifting devices).

                                                                        AO21.5
                                                                        For twin jetty structures with central boat lifting devices­
                                                                        (a)    are only permitted in the absence of any jetties;
                                                                        (b)    the structure does not exceed 10 metres in length;
                                                                        (c)    the structure does not exceed 7 metres in width; and
                                                                        (d)    each jetty is a maximum of 1.5 metre wide.

                                                                        Editor's Note ­ Refer to Figures below.
                                                                        Figure 9.4.10.9.3H ­ Boat Lifting Devices ­ Cable & Winch
                                                                        Figure 9.4.10.9.3J ­ Alternative Boat Lifting Device ­ Twin Jetty
                                                                        Figure 9.4.10.9.3K ­ Pneumatic Float (Platform)
                                                                        Figure 9.4.10.9.3L ­ Floating Pontoon

     Table 9.4.11.3 Criteria for assessment (part)
      Performance Outcomes                                              Acceptable Outcomes
      Fixed Floating Structures & Boat Ramps within Noosa Waters Estate waterways
      PO22
      Fixed floating structures whether or not attached to land (e.g.   No acceptable outcome provided
      pontoons and any associated walkways) and boat ramps are
      not located within the Noosa Waters Estate.

     Table 9.4.11.3 Criteria for assessment (part)
      Performance Outcomes                                              Acceptable Outcomes
      Flooding and amenity functions ­ operational works within Noosa Waters Estate waterways
      PO23                                                              AO23.1
      The flood detention and amenity functions of the area adjacent    For premises adjoining a waterway within the Noosa Water
      to the revetment wall within Noosa Waters Estate are retained     estate, no building work, filling or excavation works within 4.5
      and enhanced by ensuring—                                         metres of the centre line of the top of the concrete revetment
      (a)   works do not protrude through a batter line of 1:4.5        wall.
            measured from the centre line of the revetment wall;
                                                                        AO23.2
      (b)   there is no additional load placed on the revetment wall;
                                                                        A minimum of 25% of the area within 4.5 metres of the
      (c)   works do not pose a risk to the membrane adjoining the      revetment wall is planted with shrubs and small trees with a
            revetment wall;                                             mature height of 3 metres or less.




**FINAL DRAFT ­ Post Consultation 2019**                                                                                               Page 8 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.