Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Infrastructure and services
PO12 AO12.1
New lots are located, sized and configured so as to ensure each All lots are connected to power supply and telecommunications
lot is capable of being serviced by appropriate levels of services and where located within the Urban boundaries, power
infrastructure including: supply and communications infrastructure are provided
(a) power supply; underground.
(b) telecommunications; and
AO12.2
(c) where within Local Plan Areas If located in a water service area each new lot can be connected
(d) reticulated water supply; to Unitywater’s water supply network.
(e) reticulated sewerage; and
AO12.3
(f) stormwater drainage. If located in a sewerage service area each new lot can be
connected to Unitywater’s sewerage network.
AO12.4
If located in a Local plan area lots can be connected to Council’s
stormwater drainage network.
AO12.5
If not in a sewerage service area each lot has sufficient area and
other attributes to ensure efficient and effective on-site
sewerage disposal.
PO13 AO13.1
Each lot is provided with safe and convenient vehicle access Vehicular access for the development is consistent with the
function and design of the road it takes access from.
AO13.2
Development does not require new or changed access to a
state-controlled road that is a limited access road unless in
accordance with the limited access policy for the state-controlled
road .
AO13.3
Access easements are in appropriate locations for safe access
and egress, and supply appropriate widths and levels of service
for the number of vehicles that will utilise them as per the
requirements of Council’s Planning Scheme Policy PSP6
Engineering design standards – Roads, drainage and
earthworks.
Editor's note- Reference should be made to the Queensland
Government's Development Assessment Mapping System to
confirm which are state-controlled roads or limited access
roads.
Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Movement Network
Traffic
PO14 No acceptable outcome provided
Traffic generated by the development is within the acceptable
**FINAL DRAFT - Post Consultation 2019** Page 7 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.