Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance Outcomes                                                 Acceptable Outcomes
      capacity of external roads and does not have an adverse impact       Editor’s Note— Further detail on traffic and the road network is
      upon the functioning of the road network.                            addressed in Part 9.4.8 Transport Code


      Roads and Pathways
      PO15                                                                 AO15.1
      Development involving the creation of new roads and pathways         Where involving the construction of a new road, road planning
      ensures infrastructure—                                              and design supports the hierarchy and functional aspects
      (a)   provides convenient, safe and efficient movement for all       identified in Council’s Planning Scheme Policy PSP6 on
            modes of transport between land use activities;                Engineering design standards – Roads, drainage and
                                                                           earthworks.
      (b)   prioritises pedestrian movement and bicycle use over
            vehicle movements;
                                                                           Editor’s Note— Further detail on road and pathway networks is
      (c)   facilitates efficient, safe and accessible bus services that   provided in Part 9.4.8 Transport Code
            connect to existing and future public passenger transport
            facilities;                                                    AO15.2
      (d)   provides through roads and minimises the use of culs-          The street layout is generally rectilinear and does not rely on
            de­sac;                                                        culs-de-sac, or where the use of a cul-de-sac is unavoidable
            minimises the extent of earthworks required by being           because of the natural features of the site, it does not exceed a
      (e)
            sympathetic to the terrain;                                    length of 200 metres.

      (f)   allows for unimpeded and practical access to each              AO15.3
            proposed lot; and
                                                                           Pathways and pedestrian routes are planned to provide clear,
      (g)   provides for mature street trees.                              safe connections between residential, open space, transit stops
                                                                           and retail areas, and are located along, or are visible from,
                                                                           streets or other public spaces.

                                                                           AO15.4
                                                                           Sufficient space and soil depth is provided for the planting of
                                                                           street trees for shade, amenity and habitat purposes.
      PO16                                                                 AO16
      The subdivision layout is designed to facilitate pedestrian and      If within 1 kilometre of the Pathways Network identified in the
      cyclist linkages with adjoining sites in the immediate area.         Local Government Infrastructure Plan located in Part 4, the
                                                                           subdivision design and layout includes pathways:
                                                                           (a)    located in accordance with the Pathways Network
                                                                                  identified in the Local Government Infrastructure Plan; or
                                                                           (b)    linking to the Pathways Network identified in the Local
                                                                                  Government Infrastructure Plan.

      PO17
      Development on land within activity centres with active frontages    No acceptable outcome provided
      are provided with access from a rear lane or other access
      streets to reduce potential conflicts with pedestrians and
      cyclists.


     Table 9.5.1.3 Criteria for assessable development (part)
      Performance Outcomes                                                 Acceptable Outcomes

      Growth management
      Open Space Network
      PO18                                                                 AO18.1
      Development provides for parks, drainage reserves and open           Active parkland or open space which links to active parkland is
      space infrastructure that:-                                          provided in accordance with the Council’s infrastructure
      (a)   provides for a range of passive and active recreation          network planning;
            settings, offering a range of informal and formal
            experiences to the community;                                  OR




**FINAL DRAFT - Post Consultation 2019**                                                                                               Page 8 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.