Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     (b)   land mapped on an overlay map;
     (c)   watercourses, drainage lines and ridges; and
     (d)   native habitat and wildlife corridors.

     Exempt clearing
     exempt clearing means—
     (a)   clearing which is a property maintenance activity;
     (b)   clearing which is reasonably necessary for emergency access or work or is immediately required in response to an accident
           or emergency;
     (c)   clearing on a category 4 lot identified as exempt clearing for a property vegetation management plan prepared and approved
           in accordance with Local Law No. 10 (Vegetation Management) ;
     (d)   clearing which is reasonably necessary for carrying out work that is—
           (i)     authorised or required under an Act, regulation or local law; or
           (ii)    specified in a notice given by the local government or another regulatory authority;

     (e)   clearing in accordance with a development approval;
     (f)   clearing on a category 1 lot, where—
           (i)     the vegetation is within three (3) metres of an existing building or class 10a structure; and
           (ii)    the clearing is reasonably necessary for access to the building or class 10a structure or has been approved in a
                   landscape plan; and
           (iii)   the vegetation is not otherwise required to be retained in accordance with a development approval;

     (g)   clearing on a category 2 lot or category 3 lot, where—
           (i)     the vegetation is within ten (10) metres of an existing building or class 10a structure; and
           (ii)    the clearing is reasonably necessary for access to the building or class 10a structure or has been approved in a
                   landscape plan; and
           (iii)   the vegetation is not otherwise required to be retained in accordance with a development approval;

     (h)   clearing on a category 3 lot or category 4 lot greater than ten (10) hectares in area, where—
           (i)     the vegetation is within 30 metres of a building or within ten(10) metres of a class 10a structure; and
           (ii)    the clearing is reasonably necessary for the control of bushfire risk to the building or class 10a structure ; and
           (iii)   the vegetation is not otherwise required to be retained in accordance with a development approval;

     (i)   clearing vegetation within the path of a utility service;
     (j)   clearing on a category 1, 2 or 3 lot, where the clearing —

           (i)     is pruning of native vegetation for the purpose of tree maintenance or hazard management; and
           (ii)    results in no more than 20% loss of the live canopy volume of a tree within a 12 month period; and
           (iii)   does not involve lopping or topping;

     (k)   the clearing is on a category 1, 2 or 3 lot, where the clearing is to vegetation that is regrowth other than the following—
           (i)     vegetation in an area identified as a landslide hazard area on a Landslide Hazard and Steep Land Overlay map;
           (ii)    vegetation which is an endangered, vulnerable and near threatened plant as defined by the Nature Conservation
                   (Wildlife) Regulation 2006;
           (iii)   vegetation which is critically endangered or vulnerable flora as defined by the Commonwealth Environment Protection
                   and Biodiversity Conservation Act 1999;
           (iv)    heathland;
           (v)     riparian vegetation;
           (vi)    vegetation in a critical habitat under the Natural Conservation Act 1992;
           (vii)   vegetation in an area that has been cleared in contravention of a local law including the former local law;
     (l)   clearing on land that is identified as an agricultural land conservation area identified on the Strategic Framework Map 2
           (Economy & Employment);
     (m)   clearing in the course of a fire management activity;
     (n)   clearing in the course of a forest practice;



**FINAL DRAFT - Post Consultation 2019**                                                                                                 Page 26 of 38
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.