Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
     (o)   clearing in accordance with a permit under the former local law.

     Essential community infrastructure
     essential community infrastructure means any one or more of the following:-
     (a)   emergency services infrastructure;
     (b)   emergency shelters;
     (c)   police facilities;
     (d)   hospitals and associated facilities; and
     (e)   stores of valuable records or heritage items
     (f)   power stations and substations;
     (g)   major switch yards;
     (h)   communication facilities;
     (i)   sewage treatment plants;
     (j)   water treatment plants.



     Extractive resources
     extractive resources means natural deposits of sand, gravel, quarry rock, clay and soil extracted from the earth’s crust and
     processed for use in construction. The term does not include minerals under the Mineral Resources Act 1989 such as metal ores,
     coal, clay for ceramic purposes, foundry sand, limestone and silica sand mined and used for their chemical properties, and rock
     mined in block or slab form for building or monumental purposes.

     Extractive resource separation area
     extractive resource separation area shown on a Extractive Resources Overlay Map, being the area surrounding the
     resource/processing area required to maintain separation from people and land uses potentially affected by impacts such as noise,
     dust and ground vibrations of existing and or future extractive operations in the resource/processing area.

     Fire access track
     fire access track means an area free of trees and able to be easily accessed by fire fighting vehicles.

     Firebreak
     firebreak means an area of land cleared of non-fire retardant vegetation of sufficient width to minimise the risk of spread of
     bushfire.

     Fire management activity
     fire management activity means the controlled use of fire for pasture management, to manage the risk of wild fire and to assist
     with the maintenance of ecological processes in vegetation communities that are ecologically adapted to fire.

     Foreshore
     foreshore means the land in the Noosa Shire lying between the high water mark and low water mark at ordinary spring tides and
     controlled by the Noosa Shire under the Local Government Act 2009.

     Forest practice
     Forest practice means planting trees, or managing, felling and removing standing trees, on freehold land or indigenous land on
     which the State does not own the trees, for an ongoing forestry business in a—
     (a)   plantation; or
     (b)   native forest, if, in the native forest—
           (i)    all the activities are conducted in a way that is consistent with the accepted development vegetation clearing code
                  applying to conducting a native forest practice; or
           (ii)   if the code does not apply to the activities, all the activities are conducted in a way that—
                  (A)       ensures restoration of a similar type, and to the extent, of the removed trees; and
                  (B)       ensures trees are only felled for the purpose of being sawn into timber or processed into another value
                            added product (other than woodchips for an export market); and


**FINAL DRAFT - Post Consultation 2019**                                                                                              Page 27 of 38
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.