The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                            Acceptable outcomes
                                                                      Drainage Manual and the Australian Rainfall and Runoff
                                                                      Guide), all lots have access to the flood free area identified
                                                                      in Table 8.2.6.5 that matches the road immunity.
      PO5                                                             AO5
      For reconfiguring a lot or operational works, development       In the Flood Hazard Overlay, or in areas otherwise
      does not directly, indirectly or cumulatively alter the flood   determined to be subject to the DFE or DSTE, development
      characteristics external to the development site for all        ensures:
      flooding and inundation events up to and including the          ﴾a﴿   there is no loss of on­site flood storage capacity;
      DFE or DSTE based on:
                                                                      ﴾b﴿   all changes to level, depth, duration and velocity of
      ﴾a﴿   current climate conditions; and                                 floodwaters are contained within the site for all flood
      ﴾b﴿   incorporating an appropriate allowance for the                  events up to and including the DFE based on current
            predicted impacts of climate change.                            climate and predicted impacts of climate change at
                                                                            2100; and
                                                                      ﴾c﴿   there is no acceleration or retardation of flows, or any
                                                                            retardation in flood warning times, elsewhere on the
                                                                            floodplain and to any overland flow paths; and
                                                                      ﴾d﴿   there is no increased stormwater ponding on sites
                                                                            upstream, downstream or in the general vicinity of the
                                                                            site.

      Resilient building design and form
      PO6                                                         AO6.1
      Development ensures that building design and building form: Buildings are designed to integrate well with the street level
      ﴾a﴿  accounts for potential flood risk;                     and the levels of adjoining properties to facilitate pedestrian
                                                                  flows and visual and physical connectivity between the
      ﴾b﴿  is resilient to flood events; and
                                                                  footpath and ground floors.
      ﴾c﴿   maintains a functional and attractive street address
            appropriate to the intended use.
                                                                      AO6.2
                                                                      Buildings incorporate appropriate screening to ensure that
                                                                      any under­storey is not visible from the street, where such
                                                                      screening does not impede flood water flows.

                                                                      AO6.3
                                                                      Residential buildings minimise risk from flooding by
                                                                      providing parking and other low intensive, non­habitable
                                                                      uses at ground level, rather than habitable uses.

                                                                      AO6.4
                                                                      Non­residential buildings and structures are oriented to the
                                                                      street by activating the street frontage with appropriate uses
                                                                      and urban design treatments such as recessed wall
                                                                      treatments, screening or landscaping, whilst allowing for
                                                                      flow through of flood waters on the ground floor.

                                                                      Editor's Note— The use of flood resilient building materials
                                                                      is also encouraged for building works up to the probable
                                                                      maximum flood to reduce the consequences of flooding.

                                                                      AO6.5
                                                                      Basements and underground car parking areas are designed
                                                                      to drain and function safely during a flood event and power
                                                                      failure.


**FINAL DRAFT ­ Post Consultation 2019**                                                                                          Page 3 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.