Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Performance outcomes Acceptable outcomes
Editor's note—Basements for residential uses should have
flood immunity above the 1%AEP defined flood event
with alternative means to mechanical pumping used to achieve
such immunity.
Basements for nonresidential uses should have flood immunity
above the 1%AEP defined flood event which may be achieved
by means of mechanical pumping where the mechanical
feature is installed with adequate holding tanks and an
alternative back up power source.
Disaster management
PO7 AO7.1
Development supports, and does not unduly burden, Development is located to support selfevacuation of people
disaster management response or recovery capacity or and ensure sufficient warning time for the nature of the use.
capabilities.
AO7.2
Development does not:
﴾a﴿ increase the number of people calculated to be at risk
from flooding;
﴾b﴿ increase the number of people likely to need
evacuation;
﴾c﴿ shorten flood warning times for other uses in the
floodplain; or
﴾d﴿ impact on the ability of traffic to use evacuation
routes, or unreasonably increase traffic volumes on
evacuation routes.
AO7.3
Materials stored on site:
﴾a﴿ are readily able to be moved in a flood event to a flood
free area; or
﴾b﴿ are contained in order to minimise movement in times
of flood.
Editor's Note— Businesses should ensure that necessary
emergency and continuity plans are in place to account for
the potential need to evacuate personnel and to relocate
property prior to a flood event.
Essential network infrastructure
PO8 AO8
Essential network infrastructure maintains effective function Essential network infrastructure that is likely to fail to
during and immediately after flood and storm tide inundation function or may result in contamination when inundated by
events. flood water (e.g. water supply pipeline air valves and the
like) is located above the DFE level (or where the DFE has not
been modelled for the area, above the highest recorded flood
level for the area).
Essential community infrastructure
PO9 AO9.1
Essential community infrastructure is able to function Essential community infrastructure is sited and constructed
effectively during and immediately after flood events. to ensure that flood levels comply with flood immunity
**FINAL DRAFT Post Consultation 2019** Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.