Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Type of development Flood Level (Defined Flood Minimum design level – Minimum finished floor level
Event ) for a 2100 planning surface level
period
electrical and other equipment that, if damaged by flood water or debris, would prevent the plant from functioning. This
equipment should either be protected from damage or designed to withstand inundation.
Major switch yard and 0.5% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical
substation level flood level + 1m
Power facilities 0.2% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical
level flood level + 1m
Sewerage treatment plant 0.1% AEP DFE/DSTE or Historical flood DFE + 0.3m or Historical
equipment level flood level + 1m
Water cycle management 0.5% AEP DFE/DSTE or Historical flood DFE+ 0.3m or Historical flood
infrastructure (water treatment level level + 1m
plant)
Other Editor's note Minimum design levels for infrastructure apply to standalone infrastructure only. Where infrastructure
is proposed as part of development, the minimum design levels nominated for that development category also apply to the
associated infrastructure.
Manufacture and storage of 1% AEP DFE/DSTE + 0.3m or DFE+ 0.3m or Historical
hazardous materials in bulk Historical flood level +1m flood level + 1m
Access roads and car parking 10% AEP DFE/DSTE + maximum n/a
inundation depth of 250mm
during 1%AEP event at 2100
Collector roads and above 1% AEP DFE/DSTE n/a
Infrastructure other than 1% AEP DFE/DSFE or Historical DFE + 0.3m or Historical
specified above flood level flood level + 1m
Table 8.2.6.5 Minimum Size of Flood Free House Site Areas or Development Areas for Lots
Zone Modelled DFE or DSTE level or where not modelled,
above the highest known flood level
Low Density Residential 100% of the lot
Medium Density Residential 100% of the lot
High Density Residential 100% of the lot
Tourist Accommodation 100% of the lot
Major Centre 100% of the lot
District Centre 100% of the lot
Neighbourhood Centre 100% of the lot
Local Centre 100% of the lot
Innovation 100% of the lot
Low Impact Industry 1000m2
Medium Impact Industry 1000m2
Community Facilities 450m2
Rural Residential 1000m2 plus additional area of effluent disposal
Rural 1000m2 plus additional area of effluent disposal
Recreation and Open Space 1000m2 or 10% of the total site area, whichever is the greater
Environmental Management and Conversation n/a
**FINAL DRAFT Post Consultation 2019** Page 7 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.