Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                              Acceptable outcomes

                                                                       OR

                                                                       AO11.3
                                                                       If a flood level is not adopted, hazardous materials and their
                                                                       manufacturing equipment are located on the highest part of
                                                                       the site to enhance flood immunity and designed to prevent
                                                                       the intrusion of flood waters.

                                                                       Editor’s Note— Refer to the Work Health and Safety Act
                                                                       2011 and associated Regulation and Guidelines, the
                                                                       Environmental Protection Act 1994 and the relevant building
                                                                       assessment provisions under the Building Act 1975 for
                                                                       requirements relating to the manufacture and storage of
                                                                       hazardous substances. Information is provided by Business
                                                                       Queensland on the requirements for storing and transporting
                                                                       hazardous chemical.

 Table 8.2.6.4 ­ Flood Levels and Flood Immunity Requirements
      Type of development               Flood Level (Defined Flood      Minimum design level –           Minimum finished floor level ­
                                        Event ) for a 2100 planning     surface level
                                        period

      General
      Business Activities                  1% AEP                       DFE/DSTE or Historical flood DFE + 0.3m or Historical
                                                                        level                        flood level + 0.6m
      Industrial Activities                1% AEP                       DFE/DSTE + 0.3m or                DFE + 0.3m or Historical
                                                                        Historical flood level + 0.6m    flood level + 0.6m
      Accommodation Activities             1% AEP                       DFE/DSTE + 0.3m or                DFE + 0.3m or Historical
      (excluding residential care                                       Historical flood level + 0.6m    flood level + 0.6m
      facility)
      Residential care facility            0.2% AEP                     DFE/DSTE or Historical flood DFE + 0.3m or Historical
                                                                        level                        flood level + 1m
      Community Activities                 0.2% AEP                     DFE/DSTE or Historical flood DFE+ 0.3m or Historical
      (education establishment,                                         level                        flood level + 1m
      childcare centre)
      Essential community infrastructure (recommended flood level) Editor's note­ Some emergency services and police
      facilities (e.g. water police and search and rescue operations) are dependent on direct water access. The flood levels do not apply
      to these aspects but other operational areas should be located above the recommended flood level to the greatest extent feasible.

      Emergency services , other           0.2% AEP                      DFE/DSTE or Historical flood DFE + 0.3m or Historical
      than police station                                               level                         flood level + 1m
      Police facilities                    0.2% AEP                      DFE/DSTE or Historical flood DFE + 0.3m or Historical
                                                                        level                         flood level + 1m
      Hospital and associated              0.2% AEP                      DFE/DSTE or Historical flood DFE + 0.3m or Historical
      facilities                                                        level                         flood level + 1m
      Stores of valuable records or        0.5% AEP                      DFE/DSTE or Historical flood DFE + 0.3m or Historical
      items of historical or cultural                                   level                         flood level + 1m
      significance
      Essential infrastructure (recommended flood level) Editor's note­ The recommended flood level only applies to


**FINAL DRAFT ­ Post Consultation 2019**                                                                                           Page 6 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.