Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 9.3.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Location
PO1 AO1.1
Dwelling houses, rooming accommodation, community Dwelling houses (including secondary dwellings) and
residences and shortterm accommodation (for holiday homes) community residences are anticipated in the Low
are located in low density environments where they: density residential zone, Rural residential zone and Rural zone.
(a) provide a high level of comfort and amenity for occupants;
AO1.2
(b) maintain amenity and privacy of neighbouring premises;
Rooming accommodation provides housing choice within
(c) are compatible with the character and streetscape of the urban boundaries.
local area; and
(d) do not alienate land intended for higher density living. AO1.3
WithinBuildings theconstructed shortstaya s areadwelling
mapped on Map SSA1 Short Stay Map 1 and Map SSA2
Short Stay Map 2 in Schedule 2, detached domestic scale low
density housing mayhouses may be available for shortterm
accommodation where:
(a) occupied by short term guests on no more than 4
occurrences in any calendar year; and
(b) occupied by short term guests for alla or partstotal of ano
more than 60 nights in any calendar year.
Editor's’s noteNote— Shortterm thisaccommodation must
not constitute or be used as a party house as separately defined
in Schedule 1 and addressed in Part 1.8.
9.3.1.3 Criteria for assessment (part)
Performance outcomes Acceptable Outcomes
Effects of Use
Removal homes
PO2 AO2.1
A removal home— Any part of a removal home that is affected by termite attack,
(a) does not have an adverse impact on the amenity of the borers, dry rot or severe weathering or is damaged as a
premises or surrounding premises; and consequence of relocation, is repaired or replaced using new
or sound secondhand materials.
(b) maintains the safety of people and property.
AO2.2
Where located within the urban boundary, external surfaces of
the building are cleaned and painted.
Editor’s Note— the urban boundary is indicated on the zone
maps contained within Schedule 2.
Editor’s Note— applicants will be required to pay a
performance bond to Council before final building approval is
granted. The bond is held by Council until all external building
works are completed to a satisfactory level, usually within a 12
to 24 month time frame.
Housing choice
PO3 AO3
A secondary dwelling: A secondary dwelling:
(a) forms part of a dwelling house and is not subdivided (a) has a maximum gross floor area of 65m²;
from the balance of the dwelling house; (b) has no more than 2 bedrooms;
**FINAL DRAFT Post Consultation 2019** Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.