Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
      Performance outcomes                                               Acceptable Outcomes
      (b)   contributes to housing choice for members of the one         (c)   does not occur on any property covered by a Building Unit
            household;                                                         Plan; and
      (c)   protects the low density residential, rural residential or   (d)   does not occur on a property that already contains a dual
            rural character of the zone;                                       occupancy or secondary dwelling.
      (d)   does not occur on a property covered by a Building Unit
            Plan or any property already containing more than one
            dwelling;
      (e)   is accompanied by sufficient car parking.

      PO4                                                                AO4
      Rooming accommodation is located on a site with convenient         Development is located within:
      access to employment or education as well as goods and             (a)   1,500 metres walking distance, via a sealed pathway, of
      services including public transport.                                     land within the Major centre zone, District centre zone or
                                                                               800 metres of land within the Neighbourhood centre
                                                                               zone; or
                                                                         (b)   800 metres walking distance, via a sealed pathway of a
                                                                               pedestrian access point of a hospital or tertiary
                                                                               education establishment; or
                                                                         (c)   400 metres walking distance, via a sealed pathway, of a
                                                                               Translink bus stop.


     9.3.1.3 Criteria for assessment (part)
      Performance outcomes                                               Acceptable Outcomes
      Building design and services
      Service and utilities
      PO5                                                                 AO5.1
      Development is provided with:                                       If located within the urban boundary, the dwelling is connected
      (a)   a level of infrastructure and services that is appropriate to to reticulated water supply, sewerage, stormwater drainage and
            its setting and sufficient for the intended use;              telecommunications infrastructure networks (where available to
                                                                          the lot).
      (b)   an effluent treatment and disposal system that does not
            have an adverse effect on ecologically important areas or
                                                                          Editor’s Note—the urban boundary is indicated on the zone
            water quality; and
                                                                          maps contained within Schedule 2.
      (c)   adequate onsite water storage to support the efficient
            use of water and is adequate for everyday use of the          AO5.2
            occupants.                                                    Where there is no reticulated water supply, the premises is
                                                                          serviced with a rainwater tank with the following minimum water
                                                                          supply capacity:
                                                                         (a)   for dwellings with no more than 3 bedrooms – 45,000
                                                                               litres; or
                                                                         (b)   for dwellings of more than 3 bedrooms or where
                                                                               including a secondary dwelling on the same premises –
                                                                               60,000 litres.

                                                                         AO5.3
                                                                         If located on a lot where reticulated sewerage is not available to
                                                                         the lot, the dwelling is connected to an on­site effluent treatment
                                                                         and disposal system.

                                                                         AO5.4
                                                                         Any onsite effluent treatment system and disposal area i s:
                                                                         (a)   not located on a slope greater than 10% (1 in 10);
                                                                         (b)   not located at or below the 1% annual exceedance
                                                                               probability (AEP) flood event;


**FINAL DRAFT ­ Post Consultation 2019**                                                                                               Page 3 of 7
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version(PDF, 14MB).pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.