Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 4 - Final New Noosa Plan Part 8-9 Schedule Appendix Track Change version
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Business activities are compatible with the purpose of the zone No acceptable outcome provided
in which they locate and the site is suitable for the use having
regard to accessibility, infrastructure and servicing.
PO2
The business activity is located within an existing business No acceptable outcome provided
centre or visitor centre shown in the Noosa Shire Centres
Hierarchy or in an industrial zone.
Table 9.3.7.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Effects of use
PO3 No acceptable outcome provided
Business activities are of a type, scale and intensity that is
consistent with the zone, locality and character of the area in
which it is located and reinforces the Noosa Shire Centres
Hierarchy.
PO4
Business activities contribute to the local economy and vibrancy No acceptable outcome provided
of the area in which it is located.
Table 9.3.7.3 Criteria for assessment (part)
Performance outcomes Acceptable outcomes
Major Infrastructure
PO5 AO5.1
Development is sufficiently separated from infrastructure Buildings and structures are not constructed under overhead
including electricity infrastructure and substations to minimise electricity transmission lines, or within easements.
the likelihood of nuisance or complaint.
AO5.2
Development adjacent to or within 50 metres of a substation,
major electricity infrastructure or major utility incorporates noise
attenuation measures such that noise levels do not exceed
5db(A) above background noise level internal to buildings
measured in accordance with AS1055.
AO5.3
Where adjoining substations, major electricity infrastructure or
major utilities, buildings are orientated so that the majority of
windows and doors face away from the infrastructure.
Table 9.3.7.3 Criteria for assessment (part)
**FINAL DRAFT Post Consultation 2019** Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.